DETAIL KOLEKSI

Perancangan konveyor pengangkat sampah dari dasar sungai


Oleh : Michael Siebert

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : Tono Sukarnoto

Pembimbing 2 : Jamal M. Afiff

Subyek : Conveyor belts - Modification

Kata Kunci : waste, belt conveyor, river, solidworks

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TA_STM_061001700031_Halaman-Judul.pdf 7
2. 2021_TA_STM_061001700031_Lembar-Pengesahan.pdf
3. 2021_TA_STM_061001700031_Bab-1_Pendahuluan.pdf 3
4. 2021_TA_STM_061001700031_Bab-2_Tinjauan-Pustaka.pdf
5. 2021_TA_STM_061001700031_Bab-3_Metodologi-Penelitian.pdf
6. 2021_TA_STM_061001700031_Bab-4_Analisis-dan-Pembahasan.pdf
7. 2021_TA_STM_061001700031_Bab-5_Kesimpulan.pdf
8. 2021_TA_STM_061001700031_Daftar-Pustaka.pdf 2
9. 2021_TA_STM_061001700031_Lampiran.pdf

D i Indonesia, sampah terdapat dimana-mana khususnya di daerah perkotaan dansekarang menjadi masalah terbesar yang dihadapi manusia saat ini. Pada saat ini,banyak solusi yang ditawarkan pemerintah setempat, seperti wiremash, pasukanoranye, dan ekskavator. Belt conveyor ini harus dimodifikasi dengan softwaresolidworks sehingga pemakaiannya efektif dan efisien. Hasil rancangan telah ditulispada bab 4 dan terdapat gambar teknik pada lampiran. Hasil rancangan ini tentulebih efektif daripada metode yang ada karena tidak memerlukan banyak sumberdaya manusia (SDM) yang ikut turut serta sehingga kemampuan dan jam kerja darisolusi pemindahan sampah ini menjadi lebih efisien dan efektif. Tentunya hal inidiharapkan membantu pemerintah dalam menangani masalah sampah yang ada saatini.

I n Indonesia, waste is everywhere, especially in urban areas and now become thebiggest problem that humans are facing today. At this time, many solutions offeredby the local government, such as wiremash, pasukan oranye, and excavators. Thisconveyor belt must be modified with solidworks software to become more effectiveand efficient . The results of the design have been written in chapter 4 and there aretechnical drawings in the appendix. The result of this design is certainly moreeffective than the existing method because it does not require a lot of humanresources (HR) to take part so that the ability and working hours of this wasteremoval solution become more efficient and effective. Of course, this is expectedto help the government in dealing with the current waste problem.

Bagaimana Anda menilai Koleksi ini ?