DETAIL KOLEKSI

Pengaplikasian konsep lean manufacturing untuk perancangan ulang tata letak pada bidang usaha milik Aboe (BUMA) Tangerang


Oleh : Doni Mohammad Adipratama

Info Katalog

Nomor Panggil : 022001914004

Penerbit : FEB - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2022

Pembimbing 1 : Dorina Widowati.

Subyek : Plant layout;Lean manufacturing

Kata Kunci : BLOCPLAN, layout, material handling costs

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2022_TA_SMJ_022001914004_Halaman-Judul.pdf 10
2. 2022_TA_SMJ_022001914004_Lembar-Pengesahan.pdf 6
3. 2022_TA_SMJ_022001914004_Bab-1-Pendahuluan.pdf 5
4. 2022_TA_SMJ_022001914004_Bab-2-Tinjauan-Pustaka.pdf
5. 2022_TA_SMJ_022001914004_Bab-3-Metodologi-Penelitian.pdf
6. 2022_TA_SMJ_022001914004_Bab-4-Analisis-dan-Pembahasan.pdf
7. 2022_TA_SMJ_022001914004_Bab-5-Kesimpulan.pdf
8. 2022_TA_SMJ_022001914004_Daftar-Pustaka.pdf 2
9. 2022_TA_SMJ_022001914004_Lampiran.pdf

B idang Usaha Milik Aboe (BUMA) merupakan jenis perusahaan yang bekerja sama dengan brand lokal. Luas area BUMA Tangerang adalah sebesar 322m2, memiliki 10 departemen terdiri dari Oemah Noor, Afdhol Frozen, Gudang Afdhol Frozen, BrandonSport, Kasir Brandon Sport, Gudang Brandon Sport, Office, Rest Room, Kamar Mandi, dan Parkiran. Tujuan penelitian ini adalah untuk menganalisis pengaplikasian konsep Lean Manufacturing untuk perancangan ulang tata letak fasilitas dengan menggunakan metode BLOCPLAN dalam meningkatkan efisiensi dan efektivitas pada BUMA Tangerang. Tata letak awal BUMA tidak efektif dan efisien terutama pada area gudang dimana gudang dari Brandon Sport Tangerang dan Afdhol Frozen digabungkan. Selain itu, lokasi gudang berada di sebelah toko Brandon Sport Tangerang dan untuk toko dari Afdhol Frozen berada setelah toko Brandon Sport sehingga jarak antara Gudang menuju toko Afdhol Frozen menjadi lebih jauh. Area Office dan Rest Room juga tidak efektif dan efisien karena tidak memiliki area sendiri melainkan berada di dalam toko Brandon Sport sehingga segala aktivitas karyawan menggangu kenyamanan pelanggang Brandon Sport karena karyawan lalu-lalang dari/menuju Office. Metode yang digunakan untuk mengelola dan menganalisis data dalam penelitian ini menggunakan aplikasi BLOCPLAN dan menghitung ongkos material handling (OMH). Hasil dari penelitian ini adalah tata Letak usulan metode BLOCPLAN telah memberikan peningkatan efisiensi dalam penerapan konsep lean manufacturing mulai dari segi jarak, waktu maupun biaya material handling karena posisi gudang masing-masing toko sudah berada bersebelahan dengan masing-masing toko, dan dengan memiliki efisiensi sebesar 49,58% dengan OMH per-bulan Rp 86.538.499.

U saha Milik Aboe (BUMA) is a type of company that cooperates with local brands. The area of BUMA's Tangerang branch is 322m2, has 10 departments consisting of Oemah Noor, Afdhol Frozen, Afdhol Frozen Warehouse, BrandonSport, Brandon Sport Cashier, Brandon Sport Warehouse, Office, Rest Room, Bathroom, and Parking. The purpose of this study was to analyze the application of the Lean Manufacturing concept for redesigning the layout of the facility using the BLOCPLAN method in increasing efficiency and effectiveness in the BUMA Tangerang. BUMA's initial layout was not effective and efficient, especially in the warehouse area where the warehouses of Brandon Sport Tangerang and Afdhol Frozen were combined. In addition, the location of the warehouse is next to the Brandon Sport store in Tangerang and the store from Afdhol Frozen is after the Brandon Sport store so that the distance between the Warehouse and the Afdhol Frozen store is further. The Office and Rest Room areas are also not effective and efficient because they do not have their own area but are located in the Brandon Sport store so that all employee activities interfere with the comfort of Brandon Sport customers because employees pass from/to the Office. The method used to manage and analyze the data in this study uses the BLOCPLAN application and calculates material handling costs (OMH). The result of this study is that the proposed layout of the BLOCPLAN method has provided increased efficiency in the application of the lean manufacturing concept starting from the distance, time and material handling costs layout of the BLOCPLAN method has provided increased efficiency in the application of the lean manufacturing concept starting from the distance, time and material handling costs because the warehouse position of each store is already adjacent to each store, and with an efficiency of 49,58% with OMH per month Rp 86.538.499.

Bagaimana Anda menilai Koleksi ini ?