DETAIL KOLEKSI

Pemodelan geologi dan estimasi sumber daya batubara di area PT. X, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur.


Oleh : Rani Ayu Rorosati

Info Katalog

Nomor Panggil : 818/tT/2021

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : Irfan Marwanza

Pembimbing 2 : Taat Tri Purwiyono

Subyek : Coal

Kata Kunci : geostatistics, variogram, classification, estimation, coal

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TA_STT_073001700050_Halaman-judul_.pdf 45
2. 2021_TA_STT_073001700050_Lembar-pengesahan.pdf 2
3. 2021_TA_STT_073001700050_Bab-1_Pendahuluan_.pdf 12
4. 2021_TA_STT_073001700050_Bab-2_Tinjauan-literatur.pdf 87
5. 2021_TA_STT_073001700050_Bab-3_Metode-penelitian.pdf 18
6. 2021_TA_STT_073001700050_Bab-4_Hasil-dan-pembahasan.pdf 31
7. 2021_TA_STT_073001700050_Bab-5_Kesimpulan_.pdf 6
8. 2021_TA_STT_073001700050_Daftar-pustaka_.pdf 6
9. 2021_TA_STT_073001700050_Lampiran.pdf 156

P enelitian Pemodelan dan Estimasi Sumber Daya Batubara dilakukan di area PTX yang berada di Kecamatan Loa Kulu, Kabupaten Kutai Kartanegara, ProvinsiKalimantan Timur yang terletak antara 116°46’ Bujur Timur hingga 116°50’ Bujur Timurdan 0°35’ Lintang Selatan dan 0°40’ Lintang Selatan. Penelitian dilakukan denganmenggunakan data sekunder yang diperoleh dari konsultan eksplorasi batubara. Padapenelitian ini digunakan sebanyak tiga seam utama yaitu (seam D, seam E, dan seam F)yang terdiri atas lapisan yang menerus dan berupa percabangan dengan jumlah datalubang bor keseluruhan penelitian adalah sebanyak 534 lubang bor dengan rata-rata spasi400 meter. Kedalaman pemboran yang bervariasi hingga mencapai 200 meter denganmetode pemboran yang digunakan berupa pemboran open hole. Untuk setiap lubang bormemiliki infromasi mengenai Hole ID, easting, northing, elevation, top dan base untuksetiap litologi dan depth untuk setiap lubang bor. Penelitian dilakuan dengan bantuanperangkat lunak menggunakan metode geostatistik dalam hal penentuan jarak titikinfromasi yaitu berdasarkan range seam D yaitu 1474, seam E yaitu 1219, dan seam Fyaitu 1594 dan menggunakan metode estimasi polygon untuk menentukan jumlah sumberdaya batubara (ton). Dari hasil penelitian dan hasil perhitungan didapat total jumlahtonase sumberdaya batubara sebesar 596,510,338 ton dengan sumber daya terukursebesar 138,747,677 ton, sumber daya tertunjuk sebesar 192,477,333 dan sumber dayatereka sebesar 265,285,328 ton.

C oal resource modeling and estimation research was conducted at PT X Area,located in Loa Kulu District, Kutai Kartanegara Regency, East Kalimantan Province,which is located between 116°46' East Longitude to 116°50' East Longitude and 0°35'South Latitude and 0 °40' South Latitude. The study was conducted using secondary dataobtained from coal exploration consultants. In this study, only three main seams wereused, namely (seam D, seam E, and seam F) which consisted of continuous andbranching layers with the total number of drill hole data in the entire study was 534boreholes with an average spacing of ±400 meters. . The drilling depth varies up to 200meters with the drilling method used in the form of open hole drilling. For each drill holehas information about the Hole ID, easting, northing, elevation, top and base for eachlithology and depth for each drill hole. The research was carried out with the help ofsoftware using geostatistical methods in terms of determining the distance of theinformation point, which was based on the range of seam D which was 1474, seam E was1219, and seam F was 1594 and used the polygon estimation method to determine theamount of coal resources (tonnes). From the results of the research and calculationresults, the total tonnage of coal resources is 596,510,338 tons with measured resourcesof 138,747,677 tons, inferred resources of 192,477,333 and indicated resources of265,285,328 tons.

Bagaimana Anda menilai Koleksi ini ?