DETAIL KOLEKSI

Evaluasi hidrolika dan pengangkatan serbuk bor pada lubang bor 8-1/2" sumur "X" lapangan "Y"


Oleh : Ferdy Muahammad Zakhrifady

Info Katalog

Nomor Panggil : 857/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Abdul Hamid

Subyek : Drilling;Hydraulics - Evaluation

Kata Kunci : hidrolika, pipe sticking, cutting

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TM_07110104_HALAMAN-JUDUL.pdf
2. 2018_TA_TM_07110104_Bab-1.pdf
3. 2018_TA_TM_07110104_Bab-2.pdf
4. 2018_TA_TM_07110104_Bab-3.pdf
5. 2018_TA_TM_07110104_Bab-4.pdf
6. 2018_TA_TM_07110104_Bab-5.pdf
7. 2018_TA_TM_07110104_Bab-6.pdf
8. 2018_TA_TM_07110104_DAFTAR-PUSTAKA.pdf
9. 2018_TA_TM_07110104_DAFTAR-SIMBOL.pdf
10. 2018_TA_TM_07110104_LAMPIRAN-A.pdf

S istem hidrolika lumpur pemboran mempunyai peranan yang penting selama operasi pemboran. Perencanaan dan kontrol yang baik dapat mempercepat operasi pemboran dan secara keseluruhan dapat menghemat biaya. Peranan utama sistem hidrolika lumpur pemboran yaitu pembersihan lubang bor dengan mengangkat serbuk bor (cutting) sampai ke permukaan melalui annulus. Apabila serbuk bor (cutting) yang mengendap tidak segera diangkat, maka akan menyebabkan berbagai macam problem pemboran seperti penggerusan serbuk bor berulang kali oleh pahat (regriding), tersangkutnya serbuk bor pada sela-sela gigi pahat (bit balling), bahkan dapat menyebabkan pipa terjepit (pipe sticking), dan juga hidrolika pahat yang tidak optimum dapat pula menjadi salah satu penyebab turunnya laju penembusan (ROP).Evaluasi perhitungan hidrolika pada pahat aktual menggunakan Metode BHI dengan membandingkan persentase antara hydraulic horse power pada pahat dengan hydraulic horse power pompa di permukaan (BHHP/HHP) x 100 % dan Bit Impact Force (BIF). Metode ini bisa dikatakan optimum jika hasil BHHP/HHP ≥ 48 %. Sedangkan pengangkatan serbuk bor (cutting) adalah menghitung Cutting Transport Ratio (Ft) optimum jika harga Ft > 90 %, menghitung Cutting Concentration (Ca) optimum jika harga Ca < 5 % dan menghitung Particle Bed Index (PBI) optimum jika PBI ≥ 1.

T he system of hydraulics mud on drilling projects has an important role during the operation of the projects. Planning and good control can accelerate the operation and be able to save on the cost. A key role of hydraulics system mud drilling projects to be namely cleaning a drill hole by lifting the cutting up to the surface by an annular. When the cutting settles not immediately appointed, it will cause various problem of drilling projects, such as regriding, bit balling, cause a pipe wedged or pipe sticking, and also of hydraulics circulation that not optimum also can make rate of penetration drop.Evaluation of hydraulics bit uses the method bhi by comparing the percentage between hydraulic the horsepower on a bit with horse power hydraulic pump in a surface ( BHHP / HHP) x 100 % and bit impact force ( BIF ) . This method can be steady if the result of the BHHP / HHP > 48 %. And While removal of cutting is measuring Cutting Transport Ratio ( Ft ) optimum if the value of Ft > 90 %, Cutting Concentration ( Ca ) optimum if the value Ca < 5 % and the Particle Bed Index ( PBI ) optimum if PBI > 1.

Bagaimana Anda menilai Koleksi ini ?