Evaluasi pemboran berarah guna menghindari fish pada sumur gas V Lapindo Brantas.Inc


Oleh : Aqil Fadhlurrahman

Info Katalog

Nomor Panggil : 832/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Abdul Hamid

Subyek : Drilling

Kata Kunci : well drilling, cement plug, comparison

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2017_TA_TM_071001300032_Halaman-Judul.pdf
2. 2017_TA_TM_071001300032_Bab-1.pdf
3. 2017_TA_TM_071001300032_Bab-2.pdf
4. 2017_TA_TM_071001300032_Bab-3.pdf
5. 2017_TA_TM_071001300032_Bab-4.pdf
6. 2017_TA_TM_071001300032_Bab-5.pdf
7. 2017_TA_TM_071001300032_Bab-6.pdf
8. 2017_TA_TM_071001300032_Daftar-Pustaka.pdf
9. 2017_TA_TM_071001300032_Daftar-Simbol.pdf
10. 2017_TA_TM_071001300032_Lampiran.pdf

P Proses pemboran sumur "V" dilakukan pada tanggal 6 februari 2004dengan teknik pemboran vertikal (vertical drilling). Pemboran tersebut dilakukansampai total depth 2890 ft MD/TVD. Ketika sedang melakukan pemboran 8 1/2”hole section terjadi permasalahan pada saat POOH yaitu pipa terjepit (stuck) yangdisebabkan oleh Pack off. Untuk menanggulangi permasalahan tersebut yaitudengan teknik Back off dan Cement plug diatas fish. Cement Plug yang dilakukanberfungsi untuk menutup fish dan sebagai media untuk pembelokkan lintasanlubang bor atau Kick Off. Setelah cement plug selesai dilaksanakan, pemboranakan dilanjutkan dengan teknik sidetrack dengan tujuan untuk menghindari fish.Sidetrack akan dilaksanakan menggunakan pemboran Type “J”. Kick off terdapatpada kedalaman 1560 ft dan Build Up Rate sebesar 30/100 ft. Total depthpemboran sidetrack ini adalah sebesar 2643 ft MD / 2630.03 ft TVD. Pada saatpemboran sidetrack terdapat permasalahan yaitu Tight Hole dan Sloughing Shale.Permasalahan tersebut dapat diatasi dengan ream Tight Hole dan Menaikkandensitas lumpur guna mengangkat cutting berlebih yang disebabkan olehSloughing Shale. Sebenarnya pemboran telah dilakukan sampai kedalaman akhir2870 ft MD, tetapi section 6 1/8” yang dibor dari kedalaman 2643 ft MD – 2870 ftMD tersebut diputuskan untuk ditutup (Cement Plug) berdasarkan data logging.Berdasarkan perbandingan lintasan perencanaan dan pelaksanaan pemboranberarah Sumur V, lintasan Pelaksanaan lebih dangkal daripada lintasan yangsudah direncanakan. Walaupun ada perbedaan panjang lintasan, tetapi target yangdiinginkan tetap tercapai.

V V well drilling process was done on February 6, 2004 with vertical drillingtechnique. The drilling was carried out to a total depth of 2890 ft MD / TVD.While drilling at the 8 1/2 "hole section there is a problem when POOH. Theproblem is stuck due to Pack off. To overcome the problem is with back offtechnique and cement plug above fish. Cement Plug that is done to close the fishand as a media for bending the drill hole or Kick Off. After the cement plug iscompleted, the drilling will be continued with sidetrack technique in order toavoid fish. Sidetrack will be executed by drilling Type "J". Kick off is at 1560 ftdepth and Build Up Rate of 30/100 ft. The total depth of this sidetrack drilling is2643 ft MD / 2630.03 ft TVD. At the time of sidetrack drilling there are problemsthat is Tight Hole and Sloughing Shale. The problem can be overcome with TightHole ream and Raise the density of mud to lift excessive cutting caused bySloughing Shale. Actually drilling has been done to the final depth of 2870 ft MD,but the 6 1/8 "section drilled from 2643 ft of MD - 2870 ft MD deprived toCement Plug based on data logging. Based on the comparison of the plannedtrajectory and the implementation of the well drilled well V, the implementationpath is shallower than the planned track. Although there are differences in tracklength, but the desired target is still achieved.