DETAIL KOLEKSI

Analisis squeeze cementing pada sumur DVR-42 lapangan Prabumulih


Oleh : Desvira Dwi Julianti

Info Katalog

Nomor Panggil : 1296/TP/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : Dina Asmaul Chusniyah

Subyek : Oil well cementing

Kata Kunci : primary cementing, cement bond log, variable density log, squeeze cementing, slurry

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STP_071001600033_Halaman-Judul.pdf
2. 2020_TA_STP_071001600033_Lembar-Pengesahan.pdf
3. 2020_TA_STP_071001600033_Bab-1_Pendahuluan.pdf 2
4. 2020_TA_STP_071001600033_Bab-2_Tinjauan-literatur.pdf 12
5. 2020_TA_STP_071001600033_Bab-3_Metodelogi-Penelitian.pdf 4
6. 2020_TA_STP_071001600033_Bab-4_Hasil-dan-Pembahasan.pdf 10
7. 2020_TA_STP_071001600033_Bab-5_Kesimpulan.pdf 1
8. 2020_TA_STP_071001600033_Daftar-Pustaka.pdf 2
9. 2020_TA_STP_071001600033_Lampiran.pdf

K egiatan pemboran industri hulu migas tidak dapat dipisahkan dari pekerjaanpenyemenan. Terdapat dua macam penyemenan yang dilakukan, yaitu Primarycementing yang dilakukan pada saat pertama kali casing dimasukan kedalam lubangbor dan Secondary cementing yang dilakukan untuk menyempurnakan penyemenanpertama. Squeeze cementing dilakukan dengan memompakan bubur semen ke titiktarget tertentu dalam sumur. Pada penelitian ini penulis akan mengevaluasi hasilpenyemenan, dimana menurut pembacaan log CBL dan VDL terdapatnya ikatansemen yang kurang sempurna pada primary cementing casing liner 7 inch sehinggaharus dilakukan squeeze cementing untuk menyempurnakan ikatan semen yangkurang baik pada sumur DVR – 42 Lapangan Prabumulih. Analisis yang dilakukanmeliputi pembacaan log before dan after squeeze cementing, perhitungan terhadapvolume slurry cement, displacement volume, dan jumlah zat aditif yang digunakanpada pekerjaan squeeze cementing.

D rilling activities of upstream oil and gas industry cannot be separated fromcementing work. There are two types of cementing that are carried out is Primarycementing which performed after the casing has been run in the hole and Secondarycementing which performed to complement the first cementing. Squeeze cementingis done by pumping cement slurry at target point in the well. In this study the authorwill evaluate the result of cementing job, where is according to the CBL and VDLreadings there is an favorable bonding cement in the primary cementing 7 inchcasing liner, so squeeze cementing must be done to repair the result of bad bondingcement in the DVR – 42 Field Prabumulih. The analysis is included the reading ofbefore and after squeeze cementing job, the calculation of volume slurry, volumedisplacment, and the amount of additives used in squeeze cementing job.

Bagaimana Anda menilai Koleksi ini ?