Analisis keekonomian pada pengembangan lapangan X dengan menggunakan sistem kontrak PSC cost recovery


Oleh : David

Info Katalog

Nomor Panggil : 1102/TP/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Bayu Satyawira

Pembimbing 2 : Andry Prima

Subyek : Mining engineering - Cost recovery

Kata Kunci : production sharing contract, cost recovery.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TM_071001500001_Halaman-Judul.pdf
2. 2019_TA_TM_071001500001_Bab-1.pdf 2
3. 2019_TA_TM_071001500001_Bab-2.pdf 8
4. 2019_TA_TM_071001500001_Bab-3.pdf
5. 2019_TA_TM_071001500001_Bab-4.pdf
6. 2019_TA_TM_071001500001_Bab-5.pdf
7. 2019_TA_TM_071001500001_Daftar-pustaka.pdf 1
8. 2019_TA_TM_071001500001_Lampiran.pdf

D i negara Indonesia terdapat berbagai jenis kontrak yang digunakandalam industri atau kegiatan migas. Jenis kontrak ini tentu bertujuan untukmemaksimalkan potensi sumber daya alam kita yang melimpah sehingga dapatmenjadi sumber pendapatan bagi negara untuk memaksimalkan potensikemakmuran rakyatnya. Jenis sistem kontrak yang dapat digunakan untuk kegiatanmigas diantaranya adalah Production Sharing Contract (PSC) Cost Recovery. CostRecovery adalah kewajiban pemerintah untuk mengeluarkan biaya yang telahdikeluarkan oleh kontraktor dengan catatan harus ditemukan cadanganhidrokarbon yang potensial untuk dikembangkan. Jika tidak, maka kontraktor tidakakan mendapat pengembalian dana dari pemerintah. Maka dari itu, diperlukankajian yang mendalam dari sisi kontraktor apakah akan menyetujui suatu proyekatau tidak sehingga didapatkan keputusan yang dapat menguntungkan secaraekonomis di masa mendatang. Indikator lain seperti hasil perhitungan Net PresentValue (NPV), Pay Out Time (POT), dan Internal Rate of Return (IRR) pada sistemkontrak PSC Cost Recovery merupakan salah satu parameter penting dalampenentuan kelayakan suatu proyek keekonomian bagi investor atau perusahaan.

I n Indonesia there are various types of contracts used in oil and gasindustries or activities. This type of contract certainly aims to maximize thepotential of our abundant natural resources so that it can become a source ofincome for the country to maximize the potential prosperity of its people. The typeof contract system that can be used for oil and gas activities includes the CostRecovery Production Sharing Contract (PSC). Cost Recovery is the government'sobligation to pay costs incurred by the contractor, provided that there is apotential for hydrocarbon reserves to be developed. If not, the contractor will notget a refund from the government. Therefore, in-depth studies are needed from thecontractor's side whether to approve a project or not so that a decision can beobtained that can be economically profitable in the future. Other indicators suchas the calculation of the Net Present Value (NPV), Pay Out Time (POT), andInternal Rate of Return (IRR) in the PSC Cost Recovery contract system are one ofthe important parameters in determining the feasibility of an economic project forinvestors or companies.