Evaluasi produktivitas alat angkut dan unit crusher LSC IIIB pada bulan September November 2018 di PT Semen Padang, Sumatera Barat
P T Semen Padang merupakan perusahaan pertambangan yang sudah beroperasi selama 109 tahun dan memiliki izin usaha pertambangan operasi produksi (IUP-OP) bahan galian batu kapur (limestone) di area IUP seluas 206,96 Ha. Dalam memproduksi, perusahaan memiliki target yang harus dipenuhi dalam setiap bulannya. Pada penelitian ini produksi alat angkut bulan September sampai dengan November memiliki masing-masing target sebesar 32.000 ton/hari dengan produksi perbulannya pada bulan September 905.061 ton/bulan, Oktober 1.029.402 ton/bulan dan November 1.053.061 ton/bulan. Kegiatan pengangkutan memiliki produksi sebesar 113% sampai dengan 115% dari target. Dengan demikian alat mekanis tersebut mampu melampaui target. Output produksi alat angkut dijadikan sebagai input atau umpan pada crusher. Namun dalam proses crushing terdapat hambatan pada crusher sehingga produksi pada bulan Oktober tidak mencapai target. Target unit crusher LSC IIIB adalah 47% dari target limestone. Hasil produksi aktual pada bulan September sebesar 369.031 ton/bulan, Oktober 565.105 ton/bulan dan November 467.453 ton/bulan. Lalu target pada bulan September sebesar 376.000 ton/bulan, Oktober 421.120 ton/bulan dan November 436.160 ton/bulan yang dimana hasil produksi aktual pada bulan September tidak mencapai target. Setelah melakukan perbaikkan waktu dengan mengurangi waktu hambatan sesuai toleransi perusahaan, didapatkan hasil produksi efektif pada bulan September sebesar 377.693 ton/bulan, Oktober 584.774 ton/bulan dan November 486.586 ton/bulan yang dimana hasil produksi efektif bulan September bisa mencapai target.
P T Semen Padang is a mining company that has been operating for 109 years and has a business license for mining production operations (IUP-OP) limestone quarrying material in an area of 206.96 Ha. In producing, the company has a target that must be met every month. In this study, the production of transportation equipment from September to November had a target of 32,000 tons / day with monthly production in September 905,061 tons / month, October 1,029,402 tons / month and November 1,053,061 tons / month. Transportation activities have a production of 113% to 115% of the target. Thus the mechanical device is able to exceed the target. The output of the conveyance is used as input or feed to the crusher. But in the crushing process there are obstacles in the crusher so that production in October does not reach the target. The LSC IIIB crusher unit target is 47% of the limestone target. The actual production in September was 369,031 tons / month, October 565,105 tons / month and November 467,453 tons / month. Then the target in September was 376,000 tons / month, October 421,120 tons / month and November 436,160 tons / month which the actual production in September did not reach the target. After increasing the time by reducing the time constraints according to company tolerance, it was found that the effective production in September was 377,693 tons / month, October 584,774 tons / month and November 486,586 tons / month where the effective production in September could reach the target.