DETAIL KOLEKSI

Usulan rancangan mobile gantry crane guna mengurangi risiko beban kerja fisik pada Stasiun Perakitan Bam Generator


Oleh : Bimo Pradipto

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2011

Pembimbing 1 : Nataya Charoonsari

Pembimbing 2 : Dian Mardi Safitri

Subyek : Production – Process;Human engineering;Manufacturing – Companies

Kata Kunci : physical workload, generator drop, product design and mobile gantry crane

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2011_TA_TI_06303099_1_Halaman-Judul.pdf 21
2. 2011_TA_TI_06303099_2_Bab-1.pdf
3. 2011_TA_TI_06303099_3_Bab-2.pdf
4. 2011_TA_TI_06303099_4_Bab-3.pdf
5. 2011_TA_TI_06303099_5_Bab-4.pdf
6. 2011_TA_TI_06303099_6_Bab-5.pdf
7. 2011_TA_TI_06303099_7_Bab-6.pdf
8. 2011_TA_TI_06303099_8_Bab-7.pdf
9. 2011_TA_TI_06303099_9_Daftar-Pustaka.pdf
10. 2011_TA_TI_06303099_10_Lampiran.pdf

B AM Generator merupakan perusahaan dibidang genset yang memulai usahanya pada Desember 2007 dan terns berkembang lewat dukungan permintaan berkelanjutan pelanggannya. Permintaan berkelanjutan tersebut berakibat padatnya jadwal produksi. Jadwal produksi yang demikian padat dikombinasikan dengan terbatasnya perlengkapan dimiliki memicu adanya risiko beban fisik khususnya pada para teknisi stasiun perakitan. Risiko beban kerja fisik dapat diidentifikasikan dari keluhan (pengamatan lapangan) dan survey task analysis yang dilakukan pada penelitian pendahuluan. Berdasar keluhan pekerja, terdapat tiga pekerjaan yang secara dominan dianggap berat, yaitu menaikan bor magnet, memindahkan besi UNP dan menurunkan generator. Ketiga pekerjaan tersebut kemudian dinilai risiko beban fisiknya guna mengetahui pekerjaan manakah yang perlu segera dibenahi. Lewat pengolahan data, didapat pekerjaan menurunkan generator adalah pekerjaan dengan risiko beban fisik terbesar dan hams dibenahi, dengan nilai RULA; Grand Score 7, Action Level 4 dan nilaii Revised NIOSH 1994; Lifting Index Origin 6,57, Lifting Index Destinatio 3,04. Penelitian berlanjut pada proses pemilihan jenis alat bantu yang mugkin diterapkan, dan memutuskan solusi perbaikan adalah dengan pembutan gantry crane. Setelah melalui proses perancangan dengan metode Ulrich (2008), mobile gantry crane kemudian diaplikasikan. Pada pengaplikasian dilakukan juga penelitian kelayakan serta perbandingan risiko beban kerja dengan kondisi awal penurunan generator. Melalui penelitian dan perbandingan tersebut disimpulkan bahwa mile gantry crane apat mengurangi nilai risiko beban kerja fisik pada pekerjaan penurunan generator. Adapun beberapa parameternya adalah RULA; Grand Score 4, Action Level 2 dan nilai Revised NIOSH 1994; Lifting Index Origin 0,29, Lifting Index Destination 0,17. Selain itu mobile gantry crane terbukti mampu diaplikasikan pada pekerjaan lain pada lantai produksi BAM Generator.

B AM Generator is a genset company that started its business in December 2007 and has grown through the continuous support of its customers. Such sustained demand resulted in denser production schedules. Such a dense production schedule combined with limited equipment has triggered the risk of physical burden, especially on assembly line technicians. The risk of physical workload can be identified from complaints (field observation) and survey task analysis conducted on preliminary research. Based on workers' complaints, there are three jobs that are dominantly considered heavy, ie raising magnetic drill, removing UNP iron and lowering generator. The three jobs are then assessed the risk of physical burden to find out which jobs need to be addressed immediately. Through data processing, the job of generating a generator is a job with the greatest physical risk risk and must be addressed, with RULA value; Grand Score 7, Action Level 4 and Value Revised NIOSH 1994; Lifting Index Origin 6.57, Lifting Index Destinatio 3.04. The study continues on the process of selecting the type of tool that may be applied, and deciding the repair solution is by making a gantry crane. After going through the design process with Ulrich (2008) method, mobile gantry crane is then applied. On the application also conducted a feasibility study and comparison of workload risk with the initial condition of the generator decrease. Through these studies and comparisons it was concluded that a mile gantry crane apat reduces the value of physical workload risk on generator down work. The several parameters are RULA; Grand Score 4, Action Level 2 and Revised NIOSH 1994; Lifting Index Origin 0.29, Lifting Index Destination 0.17. Besides mobile gantry crane proved able to be applied to other work on BAM Generator production floor.

Bagaimana Anda menilai Koleksi ini ?