DETAIL KOLEKSI

Evaluasi dan optimasi rig less thru-tubing sand screen sebagai sand control untuk lapangan X


Oleh : Meliana

Info Katalog

Nomor Panggil : 836/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Sisworini

Pembimbing 2 : Suryo Prakoso

Subyek : Well - drilling

Kata Kunci : natural flow, slickline, productivity

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TM_07113123_Halaman-Judul.pdf 21
2. 2018_TA_TM_07113123_Bab-1.pdf 3
3. 2018_TA_TM_07113123_Bab-2.pdf
4. 2018_TA_TM_07113123_Bab-3.pdf
5. 2018_TA_TM_07113123_Bab-4.pdf
6. 2018_TA_TM_07113123_Bab-5.pdf
7. 2018_TA_TM_07113123_Bab-6.pdf
8. 2018_TA_TM_07113123_Daftar-Pustaka.pdf 1
9. 2018_TA_TM_07113123_Lampiran.pdf

L Lapangan “X” adalah lapangan yang diproduksikan secara sembur alam danterletak di Sumatera Selatan, Indonesia. Lapangan ini mulai mengalami masalahkepasiran pada tahap produksi. Stand alone sand screen terpilih sebagai metodesand control yang sesuai untuk lapangan “X”, sand screen dipasang menggunakanslickline, sehingga istilah yang digunakan untuk sand screen menjadi rig less thrutubingsand screen. Dalam penerapannya, opening size dari screen tidak sesuaisehingga menyebabkan terjadinya plugging dan produktivitas sumurnya menurunsecara berkelanjutan. Dilakukan pergantian screen opening size. Selain itu,dilakukan pergantian ID sand screen dan penggunaan dua sand screen, yangberperan untuk meningkatkan produktivitas sumur dan memperlambat terjadinyaplugging.Tugas akhir ini akan menguraikan pembuktian masalah kepasiran padalapangan “X”, karateristik sand grains dari ketiga sumur yang diteliti, bagaimanaakhirnya stand alone sand screen dan slickline terpilih sebagai metode yang tepat,evaluasi screen opening size yang sudah terpasang dan penentuan ukuran yangbaru, serta penentuan performa produksi sumur setelah sand screen terpasang baikuntuk kondisi ketika opening size yang salah digunakan maupun untuk kondisiketika opening size yang baru, ID dirubah, dan dua sand screen digunakan

“X” field is a field which produced by natural flow and located in SouthSumatera, Indonesia. This field starting to experience sand problem at productionstage. Stand alone sand screen is chosen as the appropriate sand control method for“X” field, sand screen is installed using slickline, so the term which used for sandscreen become rig less thru tubing sand screen. In its implementation, opening sizeof screen is not suitable, so that causing the occurrence of plugging and the well’sproductivity decrease continuously. Screen opening size is changed. In addition, IDof sand screen is changed and two sand screen is used, which role to increase thewell’s productivity and retard the occurrence of plugging.This final assignment will elaborate sand problem verification on “X” field,sand grains characteristics of three observed wells, how eventually stand alone sandscreen and slickline are chosen as the appropriate method, evaluation of screenopening size that already installed and new size determination, and productivityperformance determination after sand screen installed either for condition whenwrong opening size is used or for condition when new opening size, ID changed,and two sand screen is used.Evaluasi dan optimasi rig less thru-tubing sand screen sebagai sand control untuk lapangan XMeliana

Bagaimana Anda menilai Koleksi ini ?