DETAIL KOLEKSI

Analisis pengaruh ketersediaan blasted material terhadap produktivitas excavator di PT. Ricobana Abadi Jobsite Lati PT. Berau Coal, Kalimantan Timur


Oleh : Adrian Kristanto

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Pancanita Novi Hartami

Pembimbing 2 : Edy jamal Tuheteru

Subyek : Kuz-ram method;Fragmentation

Kata Kunci : excavator, production, productivity, fragmentation, kuz-ram method

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TB_07312008_Halaman-Judul.pdf
2. 2016_TA_TB_07312008_Bab-1.pdf
3. 2016_TA_TB_07312008_Bab-2.pdf
4. 2016_TA_TB_07312008_Bab-3.pdf
5. 2016_TA_TB_07312008_Bab-4.pdf
6. 2016_TA_TB_07312008_Bab-5.pdf
7. 2016_TA_TB_07312008_Bab-6.pdf
8. 2016_TA_TB_07312008_Bab-7.pdf
9. 2016_TA_TB_07312008_Daftar-Pustaka.pdf
10. 2016_TA_TB_07312008_Lampiran.pdf

S Sasaran produksi akan tercapai jika produktivitas alat produksi mencapai ataubahkan melebihi target minimum yang telah ditetapkan. PT Ricobana Abadi(PTRA), salah satu kontraktor PTBC yang beroperasi di Pit ON dan Pit OS LMO,menargetkan produktivitas minimum alat gali muat tipe PC1250 sebesar 480BCM/jam dan 780 BCM/jam untuk PC2000. Untuk mencapai target tersebut makaselain ketersediaan unit, kondisi front, dan keterampilan operator, ketersediaanmaterial (overburden/interburden) serta fragmentasi hasil peledakan menjadi faktorpenting dalam pencapaian sasaran produksi. Volume produksi yang diperolehberdasarkan perhitungan produksi kerja kasar alat gali muat diperoleh dari jumlahritasi per jam dikalikan dengan kapasitas vessel alat angkut, kemudian digunakanuntuk mendapatkan produktivitas alat terhadap waktu kerja alat. Fragmentasibatuan diperoleh dengan menggunakan metode Kuz-Ram. Berdasarkanperhitungan produksi harian tidak mencapai target 45.000 BCM, dengan persentaseproduktivitas excavator PC1250 sebesar 20% pada bulan Februari dan 13% padabulan Maret. Produktivitas excavator PC2000 yang mencapai target sebesar 8%dari populasi data pada bulan Februari dan 5% pada bulan Maret. Fragmentasibatuan rata - rata hasil peledakan diperoleh ukuran 59,52 cm dengan persentaseukuran batuan kurang dari satu meter sebesar 83%.

P Production target could be reached if productivity of the machine reaches theminimum target that has been set or more. PT Ricobana Abadi (PTRA), one of thecontractors of PTBC that has been operated at Pit ON and Pit OS LMO where itsgoal of minimum productivity of type PC1250 excavator reaches 480 BCM/hourand 780 BCM/hour for PC2000. To reach this goal, besides availability ofexcavator, front condition, and operators’ skills, material availability (overburden /interburden) and fragmentation of blasting result are important factors as well.Production volume can be obtained by calculating estimation of excavatorproduction from amount of trip per hour multiplied with capacity of haul truck’svessel, and then by using it to calculate the productivity of machine towards its ownworking time. Rocks fragmentation can be obtained by using Kuz-Ram method.Based on calculation of daily productivity, it didn’t meet its target (45.000 BCM),where percentage of achievement of PC1250 excavator productivity in Februaryand March respectively 20% and 13%. Meanwhile PC2000 Excavator productivitythat meet its target was only 8% of data population in February and 5% in March.Average rock fragmentation of blasting result is 59,52 cm with percentage of rocksize less than one meter is 83%.

Bagaimana Anda menilai Koleksi ini ?