DETAIL KOLEKSI

Rancangan teknis sistem pemompaan tambang PIT Araren periode 2015 – 2019 PT. Tambang Tondano Nusajaya Kecamatan Likupang Timur, Kabupaten Minahasa Utara, Provinsi Sulawesi Utara

5.0


Oleh : Jeremy Yonathan

Info Katalog

Nomor Panggil : 531/TT/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Syamidi Patian

Pembimbing 2 : pancanita Novi Hartami

Subyek : Pipe analysis and pumping;Pumping mine

Kata Kunci : pumping, water storing duration of sump

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TB_07311049_Halaman-Judul...pdf 17
2. 2016_TA_TB_07311049_Bab-1.pdf 5
3. 2016_TA_TB_07311049_Bab-2.pdf 13
4. 2016_TA_TB_07311049_Bab-3.pdf 17
5. 2016_TA_TB_07311049_Bab-4.pdf 5
6. 2016_TA_TB_07311049_Bab-5.pdf 8
7. 2016_TA_TB_07311049_Bab-6.pdf 20
8. 2016_TA_TB_07311049_Bab-7.pdf 3
9. 2016_TA_TB_07311049_Daftar-Pustaka.pdf 1
10. 2016_TA_TB_07311049_Lampiran.pdf 79

P T. Tambang Tondano Nusajaya merupakan sebuah perusahaan pertambanganemas di Likupang Timur, Sulawesi Utara. Cuaca dan iklim yang semakin tidak menentumengakibatkan kemarau yang berkepanjangan dan curah hujan yang tinggi di musimhujan.Tingginya curah hujan menghasilkan air limpasan yang besar, dan apabila tidakteratasi akan menjadi salah satu kendala dalam tidak tercapainya target produksi. Tujuanpenelitian ini adalah untuk merancang sistem pemompaan tambang yang efektif danoptimal, dalam lingkup pemompaan jalur pipa dan perancangan sump, yang dapatmengatasi debit air limpasan dan mengurangi resiko banjir. Penelitian ini dilakukandengan menganalisa curah hujan, kemampuan pompa, merancang jalur pipa, danmenganalisa estimasi performa pemompaan dengan menggunakan rancangan yangdibuat.Hasil penelitian menunjukkan bahwa dengan menggunakan desain pemompaantambang yang baru, sump pada masing-masing catchment area dapat menampung airdengan rentang durasi selama sekitar 16.87 , 1.69, 7.98, 107.38 jam pada catchment area1, 3, 5, dan 4 serta rata-rata 4.7 jam pada catchment area 2. Terlihat dari desain sistempemompaan yang baru dirancang, resiko banjir dapat dikurangi secara signifikan diukurdari kemampuan penampungan kolam penampung dibawah kondisi curah hujanmaksimal yang dinyatakan dalam durasi penampungan kolam.

P T. Tambang Tondano Nusajaya is a gold mining company located in EasternLikupang, North Celebes. The increasingly uncertain weather and climate causesprolonged dry season and unusual high level of rainfall during rain season.The high level of rainfall can result in high amount of water run-off which cancause failure in achieving production target. The purpose of this research is to create anoptimal and effective pumping system, in the scope of pipeline and sump design, that canovercome the water run-off and decreases the risk of flooding. This research is done byanalyzing rainfall level, pump capabilities, designing pipelines, and analyzing theestimate pumping performance based on the design created.Research result shows that by using the newly designed mine pumping system,the sump at each catchment areas can hold water with a duration that is enough tosignificantly reduce flooding risk, that is approximately 16.87, 1.69, 7.98, 107.38 hoursat catchment area 1, 3, 5, 4, and average 4.7 hours at catchment area 2. It can be seenfrom the newly designed pumping system that the risk of flooding can be significantlyreduced judging by the ability of a sump to hold rain water under the maximal level ofrainfall condition which is expressed in the form of water storing duration of the sump