DETAIL KOLEKSI

Kajian teknis produktivitas alat bor untuk persiapan peledakan di PIT Paringin PT Buma Jobsite Adaro, Balangan, Kalsel

0.0


Oleh : Muhammad Rizki Adhitya

Info Katalog

Nomor Panggil : 711/TT/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Pantjanita Novi Hartami

Pembimbing 2 : Ririn Yulianti

Subyek : MIning engineering - Drill tool productivity;Mining engineering - Coal mining

Kata Kunci : productivity, drilling, diameter of the drill, production, cycle time, overburden

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TB_073001300074_Halaman-Judul.pdf
2. 2019_TA_TB_073001300074_Bab-1.pdf
3. 2019_TA_TB_073001300074_Bab-2.pdf
4. 2019_TA_TB_073001300074_Bab-3.pdf
5. 2019_TA_TB_073001300074_Bab-4.pdf
6. 2019_TA_TB_073001300074_Bab-5.pdf
7. 2019_TA_TB_073001300074_Daftar-Pustaka.pdf
8. 2019_TA_TB_073001300074_Lampiran.pdf

S Sebelum dilakukan kegiatan peledakan terlebih dahulu dilakukan kegiatan pemboran untuk membuat lubang ledak pada material overburden agar dapat diisi dengan bahan peledak. PT BUMA meggunakan 2 (dua) ukuran diameter batang bor, yaitu 6¾ inch dan 77/8 inch. Dalam kegiatan pemborannya, PT BUMA memiliki target 60 m/jam. Pada prakteknya dilapangan sering terjadi kegiatan pemboran yang overtime dikarenakan tidak tercapainya target produktivitas alat bor. Produktivitas yang tidak tercapai mengakibatkan tidak tercapainya target produksi hasil peledakan overburden, sehingga banyaknya jumlah aktual material terbongkar masih sering tidak sesuai dengan target yang sudah ditentukan. Metode yang digunakan dalam penelitian ini adalah metode kuantitatif. Data yang dimaksud adalah waktu edar (cycle time) alat bor. Pada batang bor diameter 6¾ inch didapat nilai produktivitas sebesar 58,94 m/jam dan pada batang bor diameter 77/8 inch sebesar 56,26 m/jam. Produksi hasil peledakan didapat 2.875.227,6 m3/bulan dari target produksi 3.528.620 m3/bulan. Setelah itu dilakukan reduce dari cycle time, dan diapat nilai produktivitas yg baru sebesar 67 m/jam untuk diameter 6¾ inch dan 63 m/jam untuk diameter 77/8 inch. Didapat produksi hasil peledakan sebesar 3.252.627,2 m3/bulan belum mencapai target. Setelah dilakukan penambahan satu alat bor dengan diameter 77/8 inch berdasarkan kebutuhannya didapat produksi hasil peledakan sebesar 4.059.039,1 m3/bulan.

B Before the blasting activities are carried out drilling activities are carried out to make an explosive hole in the overburden material so that it can be filled with explosives. PT BUMA uses 2 (two) sizes of drill stem diameter, namely 6¾ inch and 77/8 inch. In its drilling activities, PT BUMA has a target of 60 m / hour. In practice, overtime drilling activities often occur due to not achieving the drill productivity target. Productivity that is not achieved results in the failure to achieve the production target of the result of overburden blasting, so that the actual amount of material uncovered is still often not in accordance with predetermined targets. The method used in this study is a quantitative method. The data in question is the cycle time of the drill tool. In the 6¾ inch diameter drill stem obtained a productivity value of 58.94 m / hour and the drill stem diameter 77/8 inch of 56.26 m / hour. Production of blasting results was obtained 2,875,227.6 m3 / month from the production target of 3,528,620 m3 / month. After that it is reduced from cycle time, and a new productivity value of 67 m / h for 6¾ inch and 63 m / h for 77/8 inch diameter is obtained. Obtained blasting yields of 3.252.627,2 m3 / month have not reached the target. After the addition of one drill tool with 77/8 inch diameter selected based on its needs, the production of blasting results is 4.059.039,1 m3 / month.

Bagaimana Anda menilai Koleksi ini ?