DETAIL KOLEKSI

Evakuasi geometri peledakan menggunakan rumus R lash di PT Semen Padang, Sulawesi Barat

3.0


Oleh : Yulizar Karnadi

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Bani Nugroho

Pembimbing 2 : Irfan Marwanja

Subyek : Mining engineering - Blasting geometry

Kata Kunci : blasting, rock detonated, called boulder.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016__TA_TB_07309039_Halaman-judul.pdf 22
2. 2016__TA_TB_07309039_Bab-1.pdf
3. 2016__TA_TB_07309039_Bab-2.pdf
4. 2016__TA_TB_07309039_Bab-3.pdf
5. 2016__TA_TB_07309039_Bab-4.pdf
6. 2016__TA_TB_07309039_Bab-5.pdf
7. 2016__TA_TB_07309039_Bab-6.pdf
8. 2016__TA_TB_07309039_Bab-7.pdf
9. 2016__TA_TB_07309039_Daftar-pustaka.pdf 1
10. 2016__TA_TB_07309039_Lampiran.pdf

P PT. Semen Padang merupakan perusahaan Negara yang bergerak dibidang pertambangan Batugamping, PT. Semen Padang terletak di KelurahanIndarung Kecamatan Lubuk Kilangan yang jaraknya + 14 Km dari Pusat KotaPadang dengan ketinggian + 200 M dari permukaan laut.Blasting merupakan proses awal untuk mencapai target produksi perhari25.000 ton peledakan yang dilakukan harus mempunyai pola yang tepat. Padasaat ini pola geometri peledakan PT Semen Padang adalah 4 meter burden, 4meter spasi, Kedalaman lubang 9 m, kolom isian bahan peledak sebanyak 50 kg,1 karung AN seberat 25kg. Dengan nilai powder factor perusahan sebesar 0.39kg,,Stemming yang digunakan perusahaan adalah cutting pemboran. PT SemenPadang masih mendapat masalah tentang peledakan, batuan yang diledakanmasih berbentuk bongkahan besar, yang disebut boulder .PT Semen Padang saat ini melakukan perhitungan ulang terhadapgeometri peledakan menurut teori rumus R.L. Ash, karena geometri peledakanperusahaan belom mencapai target produksi

P PT. Semen Padang is a state enterprise that engaged in mining Limestone,PT. Semen Padang is located in the Village District of Lubuk Indarung + Kilangan adistance of 14 Km from Padang City Centre with a height of 200 + meters above sealevel.Blasting is a process of beginning to achieve the production target of 25,000tonnes per day blasting is done shall have the right pattern. At this time blastingpattern geometry PT Semen Padang burden is 4 meters, 4 meters spacing, hole depthof 9 m, the form fields as much as 50 kg of explosives, 1 sack AN weighing 25kg.With the value of the company at 0.39kg powder factor,, used Stemming thecompany is cutting drilling. PT Semen Padang still got the problem of blasting, rockdetonated still a big chunk, called boulder.PT Semen Padang to recalculate the detonation geometry according to thetheory of the formula RL Ash, because the geometry of blasting companies have notachieve production targets

Bagaimana Anda menilai Koleksi ini ?