Perencanaan prasarana sanitasi Di Kota Bekasi Periode 2000-2020 : buku II B rencana terinci jaringan pipa induk distribusi air bersih


Oleh : Ina Novita Nurliana

Info Katalog

Penerbit : FALTL - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2001

Pembimbing 1 : Ratnaningsih

Pembimbing 2 : Winarni

Subyek : Water treatment plant;Sanitation - Design

Kata Kunci : GAE ETA-N, water supply, treatment plan, PVC pipes

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2001_TA_STL_08294072_Halaman-Judul.pdf
2. 2001_TA_STL_08294072_Lembar-Pengesahan.pdf
3. 2001_TA_STL_08294072_Bab-1_Pendahuluan.pdf
4. 2001_TA_STL_08294072_Bab-2_Tinjauan-Pustaka.pdf
5. 2001_TA_STL_08294072_Bab-3_Metode-Perencanaan.pdf
6. 2001_TA_STL_08294072_Bab-4_Disain-Rinci.pdf
7. 2001_TA_STL_08294072_Bab-5_Rencana-Anggaran-Biaya.pdf
8. 2001_TA_STL_08294072_Bab-6_Penutup.pdf
9. 2001_TA_STL_08294072_Daftar-Pustaka.pdf
10. 2001_TA_STL_08294072_Lampiran.pdf

P Perencanaan jaringan pipa induk distribusi air bersih dengan IPA Pondok Ungu yang melayani Kecamatan Bekasi Barat, Bekasi Utara dan Bekasi Selatan yang meliputi 11 kelurahan. Pada perencanaan ini dibagi dalam 2 tahap pembangunan dengan cakupan pelayanan pada akhir tahap I sebesar 43 % (237048 jiwa) dan ditingkatkan menjadi 60 % (460215 jiwa) hingga akhir tahap II dengan kebutuhan total air terlayani pada akhir tahap perencanaan sebesar 2380,88 1/detik.Sistem jaringan pipa distribusi IPA Pondok Ungu menggunakan sistem melingkar sesuai dengan pola arah perkembangan Bekasi dan pola penyebaran penduduk di Kota Bekasi. Jenis pipa yang digunakan adalah PVC dengan diameter antara 150 mm sampai dengan 950 mm dengan total panjang pipa sebesar 37321,5Topografi Kota Bekasi relatif datar dan tidak berbukit maka digunakan sistem pengaliran pemompaan. Jenis pompa yang digunakan adalah GAE ETA-N Low Pressure Centrifugal Pumps : 50 Hz, n = 1450 1/menit yang dipasang paralel dengan jumlah pompa 32 unit hingga akhir tahun perencanaan. Karakteristik pompa meliputi kapasitas (300 m'/jam, 260 m3/jam dan 200 m3/jam), head pompa 60 m, efisiensi (79°%, 77% dan 75%) dan daya pompa (62 Kw, 45 Kw dan 40 Kw).Total anggaran biaya dalam merencanakan jaringan pipa induk distribusi air bersih di Kecamatan Bekasi Barat, Bekasi Utara dan Bekasi Selatan pada akhir tahap perencanaan diperkirakan sebesar Rp. 44.745.255.270,00 meliputi biaya konstniksi dan pengadaan.

A A design of Water Supply main distribution network of Pondok Ungu water Treatment Plant covering 11 Kelurahan spreaded in Western Bekasi, Northern Bekasi, as well as Southern Bekasi.The design is decided into two implementation design phases, at the end of the Phase I it is estimated that 43% ( or equal to 237048 population ) shall be covered by the service. Further, at the end of the Phase II, 60% ( 460215 population ) shall be covered. It is estimated that total water demand at the end of the design phase is 2380.88 1/s.The design cover in implementation of aloop type distribution network in Pondok Ungu Treatment Plant. This was made based on the consideration that the distribution of the population, as well as the city development of Bekasi will be happined in such a direction. Regarding the material of the pipe it has been assumed that PVC pipes will be used, ranging in diameter from MM to 950 min, with a total length of 37321,5 m.Further, consedering of a flat type topographical with almost without hills city contour of Bekasi, it has been assumed that the distribution of water will be implemented by using of pumps, of which GAE ETA-N Low Pressure Centrifugal Pumps of 50 cps, n = 1450 rpm has been refered. It is estimated that at the end of the design year they will be using 32 units of such a pump connected in parallel. The pumps theyself were characterized 300 m3/hour, 260 m /houyr and 200m /hour in capacity, 60 m in head, at the efficiency of 79%, 77% and 75%, bringing power of 62 Kw, 45Kw and 45 Kw respectively.Finally, it is estimated that based on the current situation, the total cost to cover all supplies, constrictions and design of these main distribution network is Rp. 44.745.255.270,00