DETAIL KOLEKSI

Analisis dan optimasi drillinmg rig contract di Perusahaan X mengacu pada drilling rig perfroma


Oleh : Ibrando Hasiholan Silalahi

Info Katalog

Subyek : Oil well drilling rigs

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : Taufiq Fathaddin

Kata Kunci : drilling operation, drilling performance, drilling cost, investasi, safety, drilling contract. Net P

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2022_TS_MTP_171011710004_Halaman-judul.pdf 11
2. 2022_TS_MTP_171011710004_Lembar-pengesahan.pdf 5
3. 2022_TS_MTP_171011710004_Bab-1_Pendahuluan.pdf 2
4. 2022_TS_MTP_171011710004_Bab-2_Kajian-Pustaka.pdf 20
5. 2022_TS_MTP_171011710004_Bab-3_Metodelogi-Penelitian.pdf 10
6. 2022_TS_MTP_171011710004_Bab-4_Hasil-dan-Analisis-Penelitian.pdf 6
7. 2022_TS_MTP_171011710004_Bab-5_Kesimpulan.pdf
8. 2022_TS_MTP_171011710004_Daftar-pustaka.pdf 1
9. 2022_TS_MTP_171011710004_Lampiran.pdf 23

P Pada awal tahun 2015, turunnya harga minyak dan gas di pasaran minyak dunia mempengaruhi perubahan investasi strategi dalam kegiatan pemboran atau drillingoperation perusahaan minyak internasional maupun perusahaan lokal di indonesia. Kondisi ini mengharuskan perusahaan oil dan gas untuk berinovasi pada teknologi,teknik, operasion management untuk membuat drilling cost yang lebih efisien, tanpa menurunkan kualitas dan standar keselamatan. Hal ini berpengaruh besar juga terhadap strategi dan managemen perusahaan drilling kontraktor, dimana penurunan harga minyak dan gas dipasaran minyak dunia berdampak pada penurunan daily drilling rate kontrak untuk semua tipe drilling rig tanpa kecuali. Penurunan daily drilling rate kontrak berbanding terbalik dengan harga dan biaya yang harus dikeluarkan oleh perusahaan drilling kontraktor dalam memaintain dan mengoperasikan setiap drillingunit dengan drilling performance dan standar mutu sesuai dengan standart yang ditetapkan perusahaan minyak dan gas dalam kontrak. Dalam penelitian ini akan dilakukan analisa dan optimalisasi drilling contact mengacu pada drilling Rig performance dengan mempertimbnagkan besarnya nilai kontrak, durasi kontrak dan besarnya inflasi. Untuk analisa digunakan alat parameter keekonomian berupa Net Present Value(NPV), Internal Rate Return (IRR) dan Future Value (FV). Sehingga nantinya ditemukan bottom line nilai rig kontrak optimum yang bekerja diwilayah Indonesia.

I In early 2015, falling oil and gas prices on the world oil market affected changes in strategic investment in the drilling operations of international oilcompanies and local companies in Indonesia. This condition requires oil and gas companies to innovate in technology, engineering, and operational management to make drilling costs more efficient, without reducing quality and safety standards. This also has a big influence on the strategy and management of a contractor drilling company, where the decline in oil and gas prices in the world oil market has an impact on the reduction in contract daily drilling rates for all types of drilling rigs without exception. The contract daily drilling rate reduction is inversely proportional to the price and costs that must be incurred by the contractor drilling company in maintaining and operating each drilling unit with drilling performance and quality standards inaccordance with the standards set by oil and gas companies in the contract. In this research, analysis and optimization of the drilling contact for the drilling rig will beperformed by considering the inflation of spare part prices. For the analysis used economic parameter tools such as Net Present Value (NPV), Internal Rate Return(IRR) and Future Value (FV).At the end of the research we are expecting to define the bottom line of daily drilling rate on rig drilling contarct.

Bagaimana Anda menilai Koleksi ini ?