DETAIL KOLEKSI

Evaluasi kinerja air pada Lapangan X menggunakan metode hasil plot, buckley leverett dan pattern & balance


Oleh : Muhamad Rizki

Info Katalog

Nomor Panggil : 319/TP/2016

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Rachmat Sudibyo

Subyek : Evaluation - water performance;Plot - buckley leverett

Kata Kunci : Evaluation - water performance, plot, buckley leverett

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07112146_Halaman-judul.pdf
2. 2016_TA_TM_07112146_Bab-1.pdf 3
3. 2016_TA_TM_07112146_Bab-2.pdf
4. 2016_TA_TM_07112146_Bab-3.pdf
5. 2016_TA_TM_07112146_Bab-4.pdf
6. 2016_TA_TM_07112146_Bab-5.pdf
7. 2016_TA_TM_07112146_Bab-6.pdf
8. 2016_TA_TM_07112146_Daftar-pustaka.pdf
9. 2016_TA_TM_07112146_Lampiran.pdf

I Injeksi air pada Lapangan “X” telah dilaksanakan Agustus 2013. Padatahun 2013 injeksi telah sepenuhnya diimplementasikan dan terdapat 4 sumurinjeksi dimana penginjeksian dilakukan melalui tubing dan annulus. Injeksi airdigunakan untuk mendorong minyak yang tersisa di dalam reservoir sehinggadapat diproduksikan. Diperlukan evaluasi untuk melihat kinerja injeksi airtersebut.Pada tugas akhir ini ada tiga buah metode yang akan digunakan untukmengevaluasi kinerja waterflooding ini yaitu metode Hall Plot digunakan untukmengevaluasi kondisi dari sumur injeksi. Metode Buckley-Leverett ini digunakanuntuk menghitung waktu water breakthrough dari suatu sumur injeksi menujusumur produksi. Kemudian metode Pattern & Balance digunakan untukmengetahui kapasitas injektor.Dari masing-masing evaluasi diperoleh hasil sebagai berikut. Evaluasidengan metode Hall Plot meperlihatkan sebagian besar sumur adalah stabil.Waktu water breakthrough tercepat adalah 229 hari dan yang paling lama adalah6752 hari. Kapasitas injektor di empat sumur melebihi dan di tiga sumur kurangdari yang diperhitungkan sehingga perlu dilakukan beberapa penyesuaian padakapasitas injektor.

W Waterflooding at “X” Field has been done since August 2013. In 2013, theinjection has been fully implemented and there are 4 injection wells where thewater injected through tubing and annulus. Waterflooding is used to push theremaining oil in the reservoir so that the oil can be produced. Evaluations areneeded to determine the result of waterflooding.In this final assignment, there are three methods that will be used toevaluate the waterflooding, they are the Hall Plot method to evaluate injectionwell condition, the Buckley-Leverett method to equate water breakthrough timefrom an injection well to production well. Then the Pattern & Balance method todetermine the injector capacity.Here are the results from each evaluation. Evaluation with Hall Plotmethod shown that most of the wells are stable. The fastest water breakthroughtime is 229 days and the longest one is 6752 days. Injector capacity in four wellsare more and in three wells are less than calculated, so need to do someadjustment in injector capacity.

Bagaimana Anda menilai Koleksi ini ?