DETAIL KOLEKSI

Optimasi kemampuan kerja alat gali dan angkut untuk perencanaan manajemen fleet di PT Global Makara Teknik Site Rantau, Kalimantan Selatan

1.7


Oleh : Putri Amelia Sabrina

Info Katalog

Nomor Panggil : 632/TT/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Mixsindo K. H.

Subyek : Mining tools;Mining - Management

Kata Kunci : production, effective working time, fleet management

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TB_073001400074_Halaman-Judul.pdf 18
2. 2019_TA_TB_073001400074_Bab-1.pdf 3
3. 2019_TA_TB_073001400074_Bab-2.pdf
4. 2019_TA_TB_073001400074_Bab-3.pdf
5. 2019_TA_TB_073001400074_Bab-4.pdf
6. 2019_TA_TB_073001400074_Bab-5.pdf
7. 2019_TA_TB_073001400074_Daftar-Pustaka.pdf
8. 2019_TA_TB_073001400074_Lampiran.pdf

P PT Global Makara Teknik merupakan pihak kontraktor yang melakukanproses stripping overburden dan coal getting. Produksi aktual pada bulanSeptember 2018 adalah 501.000 BCM/bulan Terdapat ketidaktercapaian produksisebesar 21.000 BCM/bulan dari rencana 522.000 BCM/bulan , sehingga dilakukanpenelitian untuk meningkatkan produksi dengan meningkatkan efisiensi kerja danmembuat waktu kerja yang rinci, serta mengoptimalkan kemampuan kerja alat galidan angkut untuk perencanaan manajemen pada fleetnya menggunakan perhitunganrimpull.Metoda yang digunakan pada penelitian ini adalah metoda penelitiantindakan (action and research) dimana peneliti melakukan pengamatan langsungterhadap objek penelitian, dalam hal ini yang menjadi objek penelitian adalahmenejemen fleet yang ada di tambang, dengan cara menghitung produktivitas alatgali muat dan alat angkut secara aktual pada tiga front kerja dengan lima fleet yangada. Selain itu menganalisis faktor-faktor yang menyebabkan rendahnya produksialat gali muat dan alat angkut dalam pencapaian target pemindahan overburdenserta melakukan simulasi perhitungan rimpull untuk rencana bulan November 2018dan Simulasi waktu kerja Bulan November 2018.Setelah disimulasikan waktu travel dan returning menggunakanperhitungan rimpull, mengurangi hambatan-hambatan yang ada di lapangan,sertamerencanakan waktu kerja efektif 2018, maka didapatkan hasil produksi rencanapenambangan Bulan November 2018 sebesar 673.420,70 BCM dengan rencanapenambangan pada tiga front dengan lima fleet, dimana target tersebut sudahmelebihi target produksi perusahaan Bulan November 2018 sebesar 441.000BCM/Bulan.

P PT Global Makara Teknik is a contractor who conducts the overburdenand coal getting stripping process. Actual production in September 2018 is 501,000BCM / Month There is an inaccessible production of 21,000 BCM / month from theplanned 522,000 BCM / month, so research is conducted to increase production byincreasing work efficiency and making detailed work time, and optimizing thedigging ability and transport for management planning on fleet using rimpullcalculations.The method used in this study is the Action Research Method (Action andResearch) where the researcher makes a direct observation of the object ofresearch, in this case the object of research is Fleet Management in the mine, bycalculating the productivity of the digging tool and the conveyance actual on 3Fronts with 5 Fleet available. and analyzing the factors that led to the lowproduction of loading and unloading equipment and transport equipment inachieving the target of overburden removal and performing a simulation of theRimpull calculation for the November sequence sequences and November workinghours.After being simulated with travel time and returning using the rimpullmethod, reducing the obstacles in the field, and planning effective working time, theproduction of November's Sequence mining plan is 673.420,70 BCM / Month withplanned mining on 3 fronts with 5 fleet and Recommended addition of tools 1 toolhauler where the target has exceeded the November 2018 production companytarget of 441,000 BCM / Month.

Bagaimana Anda menilai Koleksi ini ?