Evaluasi pelaksanaan squeeze cementing pada Sumur X Lapangan Y Cnooc Ses Ltd

4.0


Oleh : Adam Mahendra

Info Katalog

Nomor Panggil : 20/TP/2015

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2015

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : Puri Wijayanti

Subyek : Oil well cementing;Oil well casing

Kata Kunci : squeeze cementing, Cnooc Ses Ltd

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2015_TA_TM_07110304_1.pdf
2. 2015_TA_TM_07110304_2.pdf
3. 2015_TA_TM_07110304_3.pdf
4. 2015_TA_TM_07110304_4.pdf
5. 2015_TA_TM_07110304_5.pdf
6. 2015_TA_TM_07110304_6.pdf
7. 2015_TA_TM_07110304_7.pdf
8. 2015_TA_TM_07110304_8.pdf

S Squeeze cementing secara umum dapat dikatakan sebagai suatu proses dimana bubur semen didorong dibawah tekanan. Hal ini dilakukan untuk memperbaiki pekerjaan penyemenan pertama. Pada Sumur-X Lapangan-Y ini melakukan tiga kali squeeze. Dimana masing masing menggunakan semen kelas G. Squeeze pertama dilakukan untuk menutup dua interval perforasi terbawah dengan kurang lebih 8 bbl semen. Squeeze kedua dilakukan untuk menutup tiga interval perforasi teratas dengan 35 bbl semen slurry. Dan squeeze ketiga dilakukan untuk menyempurnakan squeeze kedua dimana terdapat kebocoran. Sebelum squeeze ketiga, disirkulasikan Hi-Visc dan Fracseal terlebih dahulu dengan tujuan menutup rongga yang terdapat pada proses penyemenan squeeze kedua. Setelah itu baru di squeeze 37.7 bbl. Pada interval perforasi 4130 - 4485 ft diperkirakan terdapat kebocoran dikarenakan formasi pada interval tersebut adalah formasi Batu Raja yaitu batuan karbonat yang sering terjadi loss circulation. Oleh karena itu diperkirakan ketidak sempurnaan proses penyemenan kedua dikarenakan slurry yang di-squeeze masuk dan hilang ke dalam formasi yang loss. Sumur-X Lapangan-Y ini di-squeeze untuk menutup interval perforasi diatas cement retainer dengan tujuan untuk dapat dilakukan side tracking dikemudian hari. Juga terdapat fish berupa suatu rangkaian ESP (Electric Sumbersible Pump) yang tidak dapat di fish di bawah cement retainer

S Squeeze cementing generally can be regarded as a process which encouraged cement slurry under pressure . Which is done to improve the primary cementing job. At the Well-X Field-Y there are three steps of squeeze cementing. Where each using cement grade G. First squeeze performed to close the two bottom intervals perforated with approximately 8 bbl cement. The second squeeze performed to close the top three intervals perforated with 35 bbl of cement slurry . And the third squeeze squeeze done to enhance both where there is a leak. Before the third squeeze, circulated Hi-Visc and Fracseal advance with the aim of closing the cavity contained in the second squeeze cementing process . After that, third squeeze are being performed with 37.7 bbl slurry. In the perforation interval 4130 - 4485 ft are estimated leakage. Due to the formation of the interval is the formation of carbonate rockss Batu Raja is frequent loss of circulation . Therefore, it is expected imperfections due process of cementing slurry both in squeeze enter and disappear into the formation loss . The well - X - Y Fields in squeeze to close the perforation intervals above the cement retainer for the purpose of side tracking can be done in the future side. Also there are fish in the form of a series of ESP (Electric Submersible Pump) that can not be fished under the cement retainer