Perencanaan desain casing pemboran di sumur X pada lapangan pans bumi di PLTP Tulehu


Oleh : Sri Hikmat Yesicawati Mayaut

Info Katalog

Subyek : Drilling

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2022

Pembimbing 1 : Fajar Hendrasto

Pembimbing 2 : Trijana Kartoatmodjo

Kata Kunci : geothermal, maximum load, grade casing, burst, collapse.

Status Posting : Published

Status : Tidak Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TS_MTP_171011910004_Halaman-Judul.pdf 30
2. 2021_TS_MTP_171011910004_Lembar-Pengesahan.pdf 12
3. 2021_TS_MTP_171011910004_Bab-1_Pendahuluan.pdf 9
4. 2021_TS_MTP_171011910004_Bab-2_Kajian-Pustaka.pdf 126
5. 2021_TS_MTP_171011910004_Bab-3_Metodologi-Penelitian.pdf 12
6. 2021_TS_MTP_171011910004_Bab-4_Hasil-Analisis-Penelitian.pdf 54
7. 2021_TS_MTP_171011910004_Bab-5_Kesimpulan-dan-Saran.pdf 3
8. 2021_TS_MTP_171011910004_Lampiran.pdf 18

S Salah satu faktor yang penting dalam industry minyak, gas bumi dan panas bumi adalah dilakukannya pemboran. Pemboran dilakukan sebagai usaha fluida minyak, gas bumi, dan fluida panas bumi dari reservoir ke permukaan. Dalam pemboran, salah satu komponen penting yang berpengaruh signifikan terhadap kinerja sumur operasi panas bumi adalah rancangan casing. Casing berfungsi untuk menjadi tempat mengalirnya fluida dan uap panas dari reservoir ke permukaan. Pentingnya fungsi casing pada saat pemboran karena mempunyai peranan penting, untuk itu pada penelitian ini dilakukan penentuan mengenai perencanaan casing pada sumur “X”yang bertujuan untuk mengetahui apakah rangkaian casing tersebut sudah merupakan pilihan yang paling efektif dan efesien diawali dengan penentuan titik kedalaman casing berdasarkan data-data yang diperoleh kemudian dilakukan perhitungan tekanan lumpur pemboran yang tepat untuk kondisi tekanan formasi dan rekah formasi akan di tembus pada saat melakukanpemboran, kemudian dilanjutkan dengan perencanaan grade casing yang dapat mengakomodasitekanan-tekanan yang bekerja pada lubang sumur “X”.Metode perhitungan yang digunakan dalam evaluasi ini adalah metode Maximum Loaduntuk menghitung beban burst, collapse, tension, dan biaxial dengan menggunakan korelasiantar tekanan-tekanan tersebut, serta mempertimbangkan faktor keamanan operasi pemboran,maka dapat di lakukan pemilihan grade casing yang paling efektif dan efisien. Dari perhitunganyang telah dilakukan maka diperoleh nilai Gradien Tekanan Overburden yaitu sebesar 1,084psi/ft dan nilai Gradien Tekanan Rekah 0,312 psi/ft. Setelah melakukan perencanaan jugaperhitungan diperoleh hasil, casing 20” hanya bisa sampai kedalaman 350 mTVD dengangrade K-55 ; 169 ppf; BTC;. Berdasarkan hasil tersebut, casing 20” dengan grade K-55; 169ppf, dinyatakan aman untuk digunakan pada sumur X. Dan untuk production casing 13 3/8”disarankan casing shoe hanya sampai 850 mTVD. Dengan grade S-95; 86 ppf; BTC;Berdasarkan hasil tersebut, casing 13 3/8” dengan grade S-95; 86 ppf dinyatakan aman untukdigunakan pada sumur X. Dari hasil perencanaan dan perhitungan yang telah dilakukan, makacasing 10 3/4” dengan grade HCQ-125; 65,7 ppf, dinyatakan aman untuk digunakan pada sumurX

O One of the important factors in the oil, gas and geothermal industry is drilling. Drilling is carried out as a business for oil, gas, and geothermal fluids from the reservoir to the surface. In drilling, one of the important components that has a significant effect on the performance of a geothermal operating well is the casing design. Casing serves to be a place for fluid and hot steam to flow from the reservoir to the surface.The importance of the casing function at the time of drilling because it has an important role, for this reason, in this study a determination was made regarding the casing design for the "X" well which aims to determine whether the casing series is the most effective and efficient choice, starting with determining the casing depth point based on the data. -The data obtained is then calculated for the right drilling mud pressure for the formation pressure conditions and formation fractures will be penetrated during drilling, then proceed with casing grade planning that can accommodate the pressures acting on the wellbore "X".The calculation method used in this evaluation is the Maximum Load method to calculate burst, collapse, tension, and biaxial loads by using the correlation between these pressures, and considering the safety factor of drilling operations, it is possible to select the most effective and efficient casing grade.From the calculations that have been made, the Overburden Pressure Gradient value is 1.084 psi/ft and the Fracture Pressure Gradient value is 0.312 psi/ft. After doing the planning, the calculation is also obtained, the 20” casing only reaches a depth of 350 mTVD with grade K-55; 169 pages; BTC;. Based on these results, the casing is 20” with grade K-55; 169 ppf, declared safe for use on X wells. And for casing production 13 3/8” it is recommended that shoe casings are only up to 850 mTVD. With a grade of S-95; 86 p.m.; BTC; Based on these results, the casing is 13 3/8” with grade S-95; 86 ppf is declared safe for use in well X. From the results of the planning and calculations that have been carried out, the casing is 10 3/4” with grade HCQ-125; 65.7 ppf, declared safe for use on X wells