DETAIL KOLEKSI

Evaluasi kinerja wheel loader thd ketercapaian produksi ore processing plant di PT Bumi Suksesindo, Banyuwangi, Jawa Timur

0.0


Oleh : Abyan Farras Yahya

Info Katalog

Nomor Panggil : 890/TT/2023

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2023

Pembimbing 1 : Masagus Ahmad Azizi

Pembimbing 2 : Mixsindo Korra

Subyek : Production engineering

Kata Kunci : wheel loader, dump truck,ore processing plant, productivity, production targets

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2023_TA_STT_073001900064_Halaman-Judul.pdf
2. 2023_TA_STT_073001900064_Pengesahan.pdf
3. 2023_TA_STT_073001900064_Bab-1_Pendahuluan.pdf
4. 2023_TA_STT_073001900064_Bab-2_Tinjauan-Literatur.pdf
5. 2023_TA_STT_073001900064_Bab-3_Metodologi.pdf
6. 2023_TA_STT_073001900064_Bab-4_Pembahasan.pdf
7. 2023_TA_STT_073001900064_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2023_TA_STT_073001900064_Daftar-pustaka.pdf
9. 2023_TA_STT_073001900064_Lampiran.pdf

S Salah satu kegiatan dalam kegiatan operasi penambangan adalah kegiatanoperasi produksi. Kegiatan operasi produksi ini meliputi penggalian dan materialhandling dari bahan galian. Untuk melakukan kegiatan operasi produksi langkahyang dilakukan adalah melakukan penggalian bahan galian setelah itu dilanjutkandengan kegiatan material handling. Dalam kegiatan pengolahan emas di PT BumiSuksesindo, ore yang telah diangkut dari pit selanjutnya akan di dumping ke oreprocessing plant untuk dilakukan kominusi (pengecilan ukuran), akan tetapi,apabila hopper penuh, ore akan ditimbun di finger yang merupakan tempatpenyimpanan sementara ore yang telah diangkut. Permasalahan muncul ketika oreprocessing plant mengeluhkan adanya no feeding. Target produksi emas yangtelah ditetapkan oleh PT Bumi Suksesindo pada bulan Juni 2022 adalah sebesar685,26 ton/jam. Setelah dilakukan evaluasi didapatkan produktivitas wheel loaderpada Finger 4,5, dan 6 adalah 930,46 ton/jam, 733,79 ton/jam, dan 564,58ton/jam. Produktivitas dari wheel loader yang berpasangan dengan dump trucksebesar 597,85 ton/jam.

O One of the activities in mining operations is production operations. Thisproduction operation activity includes excavation and material handling ofexcavated materials. To carry out production operations, the steps taken are toexcavate minerals after which it is continued with material handling activities. Ingold processing activities at PT Bumi Suksesindo, ore that has been transportedfrom the pit will then be dumped into the ore processing plant for comminution(downsizing), however, if the hopper is full, the ore will be stockpiled in the fingerwhich is a temporary storage area for the ore that has been transported.Problems arise when the ore processing plant complains about no feeding. Thegold production target set by PT Bumi Suksesindo in June 2022 was 685,26tonnes/hour. After evaluation, it was found that the productivity of wheel loadersat Finger 4, 5 , and 6 was 930,46 tons/hour, 733,79 tons/hour and 564,58tons/hour. The productivity of the wheel loader assisted by a dump truck 597,85tons/hour

Bagaimana Anda menilai Koleksi ini ?