DETAIL KOLEKSI

Optimasi penggunaan electric submersible pump pada sumur RN dan NM di Lapangan Y berikut rincian pemasangannya

5.0


Oleh : Christian Aditya Marpaung

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2015

Pembimbing 1 : Widartono Utoyo

Pembimbing 2 : Cahaya Rosyidan

Subyek : Artificial lift planning;Productivity formation

Kata Kunci : articial lift, well RN and NM, Y field

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2015_TA_TM_07111084_Halaman-judul.pdf
2. 2015_TA_TM_07111084_Bab-1.pdf
3. 2015_TA_TM_07111084_Bab-2.pdf
4. 2015_TA_TM_07111084_Bab-3.pdf
5. 2015_TA_TM_07111084_Bab-4.pdf
6. 2015_TA_TM_07111084_Bab-5.pdf
7. 2015_TA_TM_07111084_Bab-6.pdf
8. 2015_TA_TM_07111084_Daftar-pustaka.pdf
9. 2015_TA_TM_07111084_Lampiran.pdf

S eiring dengan berjalannya waktu maka pada umumnya Tekanan Reservoir pada suatu sumur akan berkurang. Hal ini akan memicu terjadinya penurunan produksi. Maka dari itu digunakan metode Artificial Lift untuk menaikkan produksi suatu sumur menggunakan tenaga tambahan dari luar sumur. Salah satu metode Artificial Lift yang dibahas dalam Tugas Akhir ini adalah Electric Submersible Pump (ESP). Dalam Tugas Akhir ini, penulis akan melakukan analisa produksi sumur menggunakan kurva IPR, kemudian melakukan optimasi serta perhitungan perbandingan biaya keekonomian yaitu fluid lifting cost dan oil lifting cost pada pompa ESP yang telah dipilih pada sumur RN dan NM di Lapangan Y. Selain itu juga dibahas tentang prosedur pemasangan ESP secara lengkap. Optimasi yang akan dilakukan pada Tugas Akhir kali ini adalah denganmengganti pompa ESP dengan juga memilih jumlah stages yang baru gunamenaikkan produksi pada sumur RN dan NM. Setelah menghitung faktor keekonomian, maka penulis menyarankan ESP di Sumur RN dan NM diganti dengan ESP D2400N 110 stages yang mampu memproduksikan 2120 BFPD fluida (424 BOPD) dengan oil lifting cost sebesar 1.492 US$/bbl dan ESP DN1800 170 stages yang mampu memproduksikan 1939 BFPD fluida (484 BOPD) dengan oil lifting cost sebesar 1.368 US$/bbl.

B ecause some reason, as time goes by,in every well the pressure in a reservoir declined and it can caused oil production declined. To overcome the pressure in a reservoir it need artificial from the outside of the well with a method known as Artificial Lift. The Artificial Lift method that have been choosen and will discussed in this Final Assignment is Electric Submersible Pump ( ESP ).In this Final Assignment, the author will analize the performance of the well using Inflow Performance Relationship, optimization and calculate the economic factor by count lifting cost of the ESP for RN and NM well in Y Field. The author also discuss about The Detailed Installation Method of Electric Submersible Pump. Optimization that will be count in this Final Assignment is to replace the old type of ESP with the new one with new number of stages and also doing the calculations comparison of lifting cost to the new Electric Submersible Pump for RN and NM well in Y field. After count the economic factor, the author suggested the well RN and NM replaced with ESP D2400N 110 stages than can produce 2120 BFPD fluid (424 BOPD) with the oil lifting cost is 1.492 US$/bbl and ESP DN1800 170 stages than can produce 1939 BFPD fluid (484 BOPD) with the oil lifting cost is 1.368 US$/bbl.

Bagaimana Anda menilai Koleksi ini ?