DETAIL KOLEKSI

Aplikasi desain dan evaluasi stimulus perekahan Hidrolik pada Sumur EG-01 Lapangan EG.


Oleh : Reginald

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : M. Taufiq Fathadin

Pembimbing 2 : Sri Wahyuni

Subyek : Application design;Hydraulic

Kata Kunci : application design, evaluation design, hydraulic hydraulics, Wells EG-01, EG Square.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07112183_Halaman-judul.pdf
2. 2016_TA_TM_07112183_Bab-1.pdf
3. 2016_TA_TM_07112183_Bab-2.pdf
4. 2016_TA_TM_07112183_Bab-3.pdf
5. 2016_TA_TM_07112183_Bab-4.pdf
6. 2016_TA_TM_07112183_Bab-5.pdf
7. 2016_TA_TM_07112183_Bab-6.pdf
8. 2016_TA_TM_07112183_Daftar-pustaka.pdf
9. 2016_TA_TM_07112183_Lampiran.pdf

S umur EG-01 terletak di Lapangan Tanjung Laban dan memproduksikan minyak pada Formasi Baturaja, namun karena produksi sudah tidak ekonomis pada formasi ini, formasi ini akan ditutup dan produksi akan dipindahkan kepada Formasi Telisa pada interval perforasi 723 – 725 m dengan ketebalan pasir 2.49 m. Sebelum sumur EG-01 dibuka dan diproduksikan pada Formasi Telisa ini, PT Pertamina EP Asset 1 Field Ramba telah merencanakan stimulasi perekahan hidrolik pada sumur tersebut. Perencanaan ini berdasarkan tinjauan kepada sumur disekitar EG-01 yang telah lebih dulu berproduksi pada Formasi Telisa yang memiliki laju alir yang rendah tanpa dilakukan stimulasi perekahan. Pada sumur EG-01 diperoleh hasil permeabilitas sebesar sekitar 18 mD pada Formasi Telisa dengan tekanan sekitar 900 psi. Nilai permeabilitas dan tekanan ini adalah nilai sestimasi dilihat berdasarkan sumur-sumur yang berada di dekat EG-01 yang berproduksi di Formasi Telisa. Tujuan hydraulic fracturing pada sumur EG-01 ini adalah untuk meningkatkan produktivitas sumur.Pada penulisan tugas akhir ini akan dilakukan analisa terhadap perancanganperekahan dan evaluasi perekahan hidrolik dimulai dari proses pengumpulan datayang akan digunakan dan menentukan parameter opsional meliputi model geometrirekahan, laju injeksi, proppant dan fluida perekah, hingga evaluasi hasil yangmeliputi perbandingan harga permeabilitas (k), perbandingan laju alir, kelipatankenaikan productivity index, dan keekonomian.

W ell EG-01 is an oil well located at Field Tanjung Laban and has been producing oil from Baturaja Formation. Because an economic reason where the oil flowrate of this well is getting smaller every day, this well is planned to be closed its productions from Baturaja Formation and moved to Telisa Layer. Telisa Layer has depth interval started from 723 m to 725 m and has its sand thickness at 2.49 m. Before EG-01 is opened and produced at this Telisa Layer, PT Pertamina EP Asset 1 Field Ramba has been planned to do a hydraulic fracturing job for this well, according to another wells surrounding the EG-01 that have a small oil flow rate without getting a stimulation. Well EG-01 has its permeability around 18mD and reservoir pressure around 900 psi. These initial data are estimated according to another wells surrounding EG-01 that have a same production layer which is Telisa Layer. Fracturing job is planned to increase the productivity of Well EG-01. This thesis will be started from collecting field data which is needed to make an initial fracture design. These input data will generate new parameters that will be needed to do a redesign job. The final process is evaluation job that will be purposed on the difference of the values between pre-job and post-job which is included permeability difference, flow rate difference, the fold of increase, and economic.

Bagaimana Anda menilai Koleksi ini ?