DETAIL KOLEKSI

Kajian daerah aliran sungai terhadap potensi rawan banjir di desa Tlepok Karangsambung Kebumen Jawa Tengah


Oleh : Marissa Theodora Massang

Info Katalog

Nomor Panggil : 848/TT/2022

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2022

Pembimbing 1 : Reza Aryanto

Pembimbing 2 : Taat Tri Purwiyono

Subyek : Flood control

Kata Kunci : flooding, flow discharge, mining, channels, drainage system

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2022_TA_STT_073001700037_Halaman-judul.pdf 10
2. 2022_TA_STT_073001700037_Pengesahan.pdf 5
3. 2022_TA_STT_073001700037_Bab-1_Pendahuluan.pdf 4
4. 2022_TA_STT_073001700037_Bab-2_Tinjauan-Literatur.pdf 16
5. 2022_TA_STT_073001700037_Bab-3_Kerangka-konsep.pdf 18
6. 2022_TA_STT_073001700037_Bab-4_Metode.pdf 108
7. 2022_TA_STT_073001700037_Bab-5_Kesimpulan.pdf 6
8. 2022_TA_STT_073001700037_Daftar-Pustaka.pdf 6
9. 2022_TA_STT_073001700037_Lampiran.pdf 117

S Sistem penyaliran tambang merupakan upaya pengendalian aliran air yangmasuk di suatu wilayah kerja agar tidak mengganggu aktifitas penambangan.Penelitian ini dimaksudkan sebagai bentuk implementasi dari sistem penyalirantambang berupa perhitungan debit dengan memperhatikan kondisi daerah aliransungai, kemudian dilakukan perhitungan debit rencana periode ulang untukmengestimasi debit banjir di lokasi penelitian. Untuk sungai dengan debit aliranyang tinggi maka direncanakan penurunan debit banjirnya agar mencegah tinggimuka air saluran melebihi kapasitasnya. Lokasi penelitian berada di desa Tlepok,kecamatan Karangsambung, kabupaten Kebumen, Jawa Tengah. Pada penelitiandidapatkan debit aliran sungai maksimum sebesar 1365,41 m3/s dan debit rencanaperiode ulang sebesar 520.46 m3/s sampai dengan 687,47 m3/s. Berdasarkan hasilperhitungan maka dilakukan perencanaan alih fungsi lahan dan perencanaannormalisasi sungai untuk menurunkan debit pada daerah aliran sungai di DesaTlepok.

M Mine drainage system is an effort to control the flow of water entering a workarea so as not to interfere with mining activities. This research is intended as aform of implementation of the mine drainage system in the form of a dischargecalculation by taking into account the condition of the watershed, then calculatingthe discharge plan for the return period to predict flood discharge at the researchlocation. For rivers with high flow rates, it is planned to reduce the flood dischargein order to prevent the channel water level from exceeding its capacity. Theresearch location is in Tlepok village, Karangsambung sub-district, Kebumendistrict, Central Java. In the study, the maximum river flow discharge was 1365.41m3/s and the planned return period discharge was 520.46 m3/s up to 687.47 m3/s.Based on the calculation results, land conversion planning and river normalizationplanning were carried out to reduce the discharge in the watershed in TlepokVillage.

Bagaimana Anda menilai Koleksi ini ?