DETAIL KOLEKSI

Studi perencanaan penyambungan jaringan transmisi PLTSA Sunter 45 MW terhadap subsistem Priok 150 KV

5.0


Oleh : Lendy Khalisma Zein

Info Katalog

Subyek : Renewable energy sources;Electric power plants - Environmental aspects

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : Syamsir Abduh

Kata Kunci : PLTSA, load flow study, short circuit

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TA_MTE_062011900003_Halaman-Judul.pdf
2. 2021_TA_MTE_062011900003_Lembar-Pengesahan.pdf 3
3. 2021_TA_MTE_062011900003_Bab-1_Pendahuluan.pdf 4
4. 2021_TA_MTE_062011900003_Bab-2_Tinjauan-Pustaka.pdf -1
5. 2021_TA_MTE_062011900003_Bab-3_Metodologi-Penelitian.pdf
6. 2021_TA_MTE_062011900003_Bab-4_Analisis-dan-Pembahasan.pdf 8
7. 2021_TA_MTE_062011900003_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2021_TA_MTE_062011900003_Daftar-Pustaka.pdf 1
9. 2021_TA_MTE_062011900003_Lampiran.pdf

D Dalam rangka memenuhi kebutuhan listrik di Jawa – Bali khususnya Ibu kota DKI Jakarta, Agar tercukupi ketersediaan listrik. bahwa pengembangan tenagalistrik diprioritaskan menggunakan potensi energi baru terbarukan. Menganalisispenambahan nilai tegangan dan arus pada Gardu Induk Kemayoran yang terhubunglangsung pada PLTSa kemudian untuk setting ulang peralatan yang ada di GarduInduk Tersebut. Saat ini sedang direncanakan pembangunan PLTSa (PembangkitListrik Tenaga Sampah) dan Jaringan trasmisi yang akan terhubung pada Subsistem Muara Karang-Priok yaitu pembangunan 1 unit PLTSa dengankapasitas 45 MW di Sunter dengan output tegangan 6,3 kV yang akan terhubunggrid ke Sub sistem interkoneksi 150 kV menggunakan Generator Transformer 60MVA, diharapkan dapat beroperasi tahun 2022 Untuk mengoptimalkan KebutuhanDaya listrik dan Memperkecil angka drop Tegangan . Dalam pengajuanperencanaan untuk pembangunan perlu diadakan beberapa kajian antara lain studialiran daya (load flow), tegangan, dan frekuensi. Dalam tesis ini membahaspengaruh operasi PLTSa terhadap operasi sistem 150 kV ditekankan padapembahasan studi aliran daya dan tegangan terutama pada peralatan listrik

T To meet the demand for electricity in Java - Bali, especially the capital city of DKIJakarta, in order to meet the availability of electricity. that the development ofelectric power is prioritized using the potential of new and renewable energy.Analyzing the addition of voltage and current values at the Kemayoran Substationwhich is directly connected to the PLTSa then for resetting the existing equipmentat the Substation. This time being planned to build PLTSa (Waste Power Plant) andtransmission network that will be connected to the Muara Karang-Priok Subsystem,that is the construction of 1 PLTSa unit with a capacity of 45 MW in Sunterwith an output voltage of 6.3 kV which will be connected to the grid to the 150 kVinterconnection sub system using a 60 MVA Generator Transformer, expected canoperate in 2022 To optimize electricity demand and reduce voltage drop figures. Inplanning submission for development, needs to be held several studies include thestudy of power flow (load flow), voltage, and frequency.. In this thesis discuss theeffect of PLTSa operation on the 150 kV system operation, emphasizing thediscussion of power flow and voltage studies especially in electrical equipment.

Bagaimana Anda menilai Koleksi ini ?