Evaluasi peningkatan risiko pada masa sebelum pandemi dan saat pandemi pada proyek Bintaro Xchange Tahap 2

3.5


Oleh : Dicky Teguh Saputra

Info Katalog

Penerbit : FTSP - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : Susianti Winoto

Subyek : Construction contracts;Construction industry

Kata Kunci : evaluation, pandemic, construction project

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TA_STS_051001500032_Halaman-Judul.pdf 11
2. 2021_TA_STS_051001500032_Lembar-Pengesahan.pdf 5
3. 2021_TA_STS_051001500032_Bab-1_Pendahuluan.pdf 3
4. 2021_TA_STS_051001500032_Bab-2_Tinjauan-Pustaka.pdf
5. 2021_TA_STS_051001500032_Bab-3_Metodologi-Penelitian.pdf
6. 2021_TA_STS_051001500032_Bab-4_Analisis-dan-Pembahasan.pdf
7. 2021_TA_STS_051001500032_Bab-5_Kesimpulan.pdf
8. 2021_TA_STS_051001500032_Daftar-Pustaka.pdf 2
9. 2021_TA_STS_051001500032_Lampiran.pdf

P Pelaksanaan suatu proyek konstruksi tidak akan pernah terhindar dari risiko baikitu risiko dalam skala kecil maupun dalam skala besar. Penerapan managemenrisiko bermanfaat untuk meningkatkan pemahaman tentang proyek konstruksi,pemahaman tentang risiko yang dihadapi proyek termasuk dampak – dampaknegatif. Pada saat pandemi seperti ini kemungkinan terjadinya risiko didalamproyek semakin bertambah besar dan untuk mengurangi dampak yang merugikanbagi pencapaian tujuan fungsional suatu proyek konstruksi, diperlukan evaluasikembali dari sistem manajemen risiko meliputi identifikasi, analisa, dan responterhadap berbagai risiko yang mungkin terjadi pada masa sebelum dan saat pandemiberlangsung. Hasil penelitian ini terdapat 6 risiko (risiko pelaksanaan, risikoperencanaan, risiko logistik, risiko lingkungan, risiko politik dan risiko finansial)yang disebabkan akibat pandemi covid-19, dimana klasifikasi level risikonyasangat tinggi terdapat pada risiko pelaksanaan pada saat pandemi adanya penerapanpelaksanaan protokol pencegahan covid-19.

T The implementation of a construction project will never be avoided from riskwhether it is a risk on a small scale or on a large scale. The application of riskmanagement is useful to improve understanding of construction projects,understanding of the risks faced by the project including negative impacts. At thetime of such a pandemic the possibility of risk in the project is increasing and toreduce the adverse impact for the achievement of functional goals of a constructionproject, a re-evaluation of the risk management system is required includingidentification, analysis, and response to various risks that may occur in the periodbefore and during the pandemic. The results of this study there are 6 risks(implementation risk, planning risk, logistics risk, environmental risk, political riskand financial risk) caused by the covid-19 pandemic, where the classification of therisk level is very high in the risk of implementation at the time of the pandemicimplementation of the covid-19 prevention protocol.