DETAIL KOLEKSI

Analisis pressure build up test dengan Metode Horner dan Kurva Derivative pada sumur RM-1 lapangan RM


Oleh : Reka Maharani

Info Katalog

Nomor Panggil : 1285/TP/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Djoko Sulistyanto

Pembimbing 2 : Hari Karyadi Oetomo

Subyek : Reservoir oil pressure - Testing

Kata Kunci : pressure build-up test, skin, flow efficiency, skin pressure drop

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STP_071001600092_Halaman-Judul.pdf
2. 2020_TA_STP_071001600092_Pengesahan.pdf
3. 2020_TA_STP_071001600092_Bab-1_Pendahuluan.pdf
4. 2020_TA_STP_071001600092_Bab-2_Teori-Dasar.pdf
5. 2020_TA_STP_071001600092_Bab-3_Metodologi.pdf
6. 2020_TA_STP_071001600092_Bab-4_Hasil-dan-Pembahasan.pdf
7. 2020_TA_STP_071001600092_Bab-5_Kesimpulan.pdf
8. 2020_TA_STP_071001600092_Daftar-Pustaka.pdf
9. 2020_TA_STP_071001600092_Lampiran.pdf

P Pressure build-up test merupakan suatu teknik pengujian tekanan transient dengan cara memproduksikan sumur dengan laju produksi konstan (flow period) selama waktu tertentu kemudian sumur ditutup (shut-in period)biasanya dengan menutup kepala sumur di permukaan. Pressure build-up testdapat dilakukan pada saat sumur ditutup dengan harapan sumur dapat kembalimendekati keadaan awal kondisi stabilnya. Uji pressure build-up ini dilakukanberdasarkan kebutuhan data karakteristik reservoir yang kemudian dapatdianalisis sebagai acuan pengembangan suatu lapangan. Data yang akandidapatkan dari uji tekanan ini diantaranya yaitu tekanan statik sumur, tekananrata-rata sumur, permeabilitas batuan, faktor skin, penurunan tekanan akibatskin, flow efficiency, serta indeks produktivitas sebagai indikator produksi darisuatu sumur.Pada tugas akhir kali ini penulis menganalisis hasil uji tekanan yangdilakukan pada sumur RM-1 lapangan RM dengan menggunakan metodeHorner dan Derivative Plot untuk mengetahui produktivitas serta karakteristiksumur RM-1 tersebut. Uji tekanan ini akan menggunakan perangkat lunak EcrinV4.02

P Pressure build-up test is a transient pressure testing technique byproducing wells with a constant production rate (flow period) for a certain timeand then a shut-in period usually by closing the wellhead on the surface . Apressure build-up test can be carried out when the well is closed in the hope thatthe well can return to its initial stable state. This pressure build-up test is basedon the data requirements of the reservoir characteristics which can then beanalyzed as field development. Data to be obtained from this pressure testinclude static well pressure, average well pressure, rock permeability, skinfactors, skin pressure drop, flow efficiency, and index productivity as indicatorsof production from a well.In this final assignment the writer analyzes the results of the pressuretest conducted on RM-1 field RM well using the Horner method and DerivativePlot to determine the productivity and characteristics of the RM-1 well. Thispressure test will use Ecrin V4.02 software.

Bagaimana Anda menilai Koleksi ini ?