DETAIL KOLEKSI

Evaluasi perencanaan casing pemboran pada sumur P-1 lapangan "Y" PT. Pertamina EP


Oleh : Try Prasetyo Adi

Info Katalog

Nomor Panggil : 370/TP/2016

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : Ali Sundja

Subyek : Pressure formation;Fine gradient

Kata Kunci : casing design, exploration well P-1, drilling

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07111354_Halaman-judul.pdf 19
2. 2016_TA_TM_07111354_Bab-1.pdf 2
3. 2016_TA_TM_07111354_Bab-2.pdf
4. 2016_TA_TM_07111354_Bab-3.pdf
5. 2016_TA_TM_07111354_Bab-4.pdf
6. 2016_TA_TM_07111354_Bab-5.pdf
7. 2016_TA_TM_07111354_Bab-6.pdf
8. 2016_TA_TM_07111354_Daftar-pustaka.pdf 3
9. 2016_TA_TM_07111354_Lampiran.pdf

P Perencanaan casing dalam suatu kegiatan pemboran merupakan salah satuaspek yang penting. Hal ini disebabkan casing yang dipasang harus selalu berada pada tempat kedudukannya, baik selama kegiatan pemboran berlangsung maupun pada saat masa produksi. Tujuan dari perencanaan casing ini adalah untuk mendapatkan ukuran casing yang tepat, dimana secara teknis cukup kuat untuk menahan gaya-gaya yang terdapat di dalam lubang bor.Hal yang dilakukan dalam perencanaan casing adalah penentuan kedalamandan posisi casing yang akan di semen, kemudian dilakukan perhitungan sepertiburst, collapse, dan tension. Jumlah tekanan yang akan diterima casing yangakan digunakan sebagai bahan acuan dalam memilih ukuran, grade, berat casing. Pada penelitian ini penulis akan mengevaluasi perencanaan casing pada sumur P- 1, Kabupaten Bekasi, Jawa Barat. Metode yang digunakan dalam perhitungan ini adalah metode Maximum Load. Tugas akhir ini diharapkan dapat digunakan sebagai saran dan bahan untuk mengevaluasi perencanaan casing yang paling baik dan aman.

C Casing design in drilling activity is one important aspect. This is due to thecasing is installed must always be in a position, either during drilling activity lasting or at the time of the production. The purpose of casing design is to get the right size of the casing, which is technically strong enough to withstand the forces in the borehole. The first step in the casing design is determine the depth and the position at casing to be set and cemented. After that, we have to calculate all the pressures exerted on the casing string of casing such as burst, collapse, and tension. These pressures will affect the strength of casing at the time of installation as well as during the production process. The amount of pressure, exerted on the casing, will determine the size, grade, weight, and exerted type of connection casing used. This final project evaluate casing design of exploration well P-1, Bekasi Regency, West Java. The evaluation focuses on casing setting depth and suitable casing grade selection that well result in optimum casing string in term of safety and economic. This study uses Maximum Load method. I sincerely hope that this study can be used to evaluate the best casing design and safe.

Bagaimana Anda menilai Koleksi ini ?