DETAIL KOLEKSI

Kajian pengendalian banjir dengan kolam retensi (studi kasus DAS Tembuku Kota Jambi)


Oleh : Gesit Soerjo Moenarko

Info Katalog

Subyek : Flood control

Penerbit : FTSP - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Trihono Kadri

Kata Kunci : pond retention system, river basin, river overflow

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TS_TS_151011710005_Halaman-judul.pdf
2. 2019_TS_MTS_151011710005_Lembar-pengesahan.pdf
3. 2019_TS_MTS_151011710005_Bab-1_Pendahuluan.pdf
4. 2019_TS_MTS_151011710005_Bab-2_Tinjauan-pustaka.pdf
5. 2019_TS_MTS_151011710005_Bab-3_Metodologi-penelitian.pdf
6. 2019_TS_MTS_151011710005_Bab-4_Hasil-penelitian.pdf
7. 2019_TS_MTS_151011710005_Bab-5_Kesimpulan-dan-saran.pdf
8. 2019_TS_TS_151011710005_Daftar-pustaka.pdf
9. 2019_TS_MTS_151011710005_Lampiran.pdf

S Sungai Tembuku merupakan salah satu sungai di Kota Jambi. Perkembangan dan tata guna lahan di DAS Tembuku merupakan daerah yang cukup massif terjadinya perubahan pada 10 tahun terakhir. Banyaknya pembangunan perumahan dan permukiman serta fasilitas-fasiltas yang menunjang kegiatan ekonomi seperti pergudangan, pertokoan di daerah tersebut menjadikan wilayah tersebut mengalami perubahan tata guna lahan yang cukup signifikan.Dengan perubahan tata guna lahan tersebut, berdampak pada kejadian banjir yang terus bertambah dari tahun ke tahun di kota Jambi. Daerah-daerah bagian hilir pada DAS sungai Tembuku menjadi daerah lebih rentan terjadi banjir.Berdasarkan hal tersebut, perlu dilakukan kajian lebih lanjut terhadap sejauh mana efektivitas pengendalian banjir menggunakan sistem kolam retensi pada DAS Tembuku Kota Jambi. Diharapkan dengan dibuatnya sistem kolam retensi pada lokasi ini, akan menjadi tempat limpasan air ketika sungai meluap. Sehingga air yang datang dapat ditampung terlebih dulu di sistem kolam retensi, kemudian dibuang ke Sungai Batanghari.Metode yang digunakan pada kajian ini yaitu (1) Analisis Curah Hujan Rencana Maksimum menggunakan metode distribusi Gumbel dan Log Person III, (2) Analisis Debit Banjir Rencana menggunakan HSS Nakayasu, (3) Simulasi Aliran 1-Dimensi dengan bantuan paket program Hidrodinamik HEC-RAS pada lokasi kajian.Upaya pengendalian banjir yang direncanakan adalah dengan kolam retensi untuk mereduksi banjir Sungai Tembuku. Berdasarkan hasil perencanaan kolam retensi dengan melihat faktor elevasi muka air dan tinggi freeboard rencana maka dipilih Alternatif 6 yang dapat mereduksi elevasi tinggi muka air di bagian hulu, tengah dan hilir sebesar 7,6 %, 6,74% dan 7,15%. Dalam kondisi muka air Sungai Batanghari naik, pintu air akan ditutup dan air dari Kota yang melalui sungai Tembuku akan ditampung sementara di kolam retensi. Pompa air akan mulai bekerja pada saat elevasi air +13,87 M. Air akan dipompa dialirkan ke sungai Batanghari dan volume banjir yang akan terjadi sebesar 187.766 m3. Untuk mengeringkan kolam retensi dengan pompa air 2 x 1,5 m3/dt yang bekerja diperlukan waktu selama 1.303,93 menit atau 21,73 jam, dan jika semua pompa air bekerja 5 m3/dt diperlukan waktu selama 782,36 menit atau 13,04 jam.

T Tembuku river basin is one of river basin in Kota Jambi.The development and the use of land in das river tembuku is an area sufficiently massif the occurrence of changes in the last years. 10. The large number of development of a housing complex and settlement as well as fasilitas-fasiltas that support the economic activities such as the stowage of , to the shopping centers in the area was made the disputed region is needed had a change of land misuse that significantly to up to us .With of the to the land , impact on the occurrence of flood increase from year to year in Kota Jambi . Part areas downstream in the watershed of the river Tembuku to be converted into a more vulnerable to floods.Based on it , needs to be done further studies of the extent to which the effectiveness of flood control to use a retention pond in river basin of Tembuku Kota Jambi. It is expected that he made system pond retention in this location , will be a place runoff of water when river overflow. So that water come first may be accommodated system of retention pond , then disposed of in rivers Batanghari.The method used in this study are (1) Maximum Plan Rainfall Analysis using Gumbel and Log Pearson III distribution methods, (2) Analysis of Flood Discharge Plans using the Nakayasu HSS, (3) 1-Dimensional Flow Simulation with the help of - Hydrodynamic program package the HEC RAS at the study site.The planned flood control effort is by retention ponds to reduce the Tembuku River flood. Based on the results of retention pond planning by looking at the water level elevation factor and the freeboard plan height, Alternative 6 was chosen that can reduce the water level elevation in the upstream, middle and downstream by 7.6%, 6.74% and 7.15%. In the condition of the Batanghari River's water level rising, the floodgates will be closed and water from the City through the Tembuku river will be temporarily accommodated in the retention pond. The water pump will start working when the water level is +13.87 M. The water will be pumped and flowed into the Batanghari river and the volume of flood that will occur is 187,766 m3. To drain the retention pond with a water pump 2 x 1.5 m3 / sec working it takes 1,303.93 minutes or 21.73 hours, and if all water pumps work 5 m3 / sec it takes 782.36 minutes or 13, 04 hours.

Bagaimana Anda menilai Koleksi ini ?