DETAIL KOLEKSI

Perancangan sistem kerja pada perakitan produk bracket pillion step di PT. Astra Otoparts Divisi Nusametal


Oleh : Nadya Dina Arafah

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2005

Pembimbing 1 : Sucipto Adisuwiryo

Subyek : Work design

Kata Kunci : work systems, product assembly, pillion step brackets, PT. Astra Otoparts, Nusametal Division

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2005_TA_TI_06301233_Halaman-Judul.pdf
2. 2005_TA_TI_06301233_Bab-1.pdf
3. 2005_TA_TI_06301233_Bab-2.pdf
4. 2005_TA_TI_06301233_Bab-3.pdf
5. 2005_TA_TI_06301233_Bab-4.pdf
6. 2005_TA_TI_06301233_Bab-5.pdf
7. 2005_TA_TI_06301233_Bab-6.pdf
8. 2005_TA_TI_06301233_Bab-7.pdf
9. 2005_TA_TI_06301233_Daftar-Pustaka.pdf
10. 2005_TA_TI_06301233_Lampiran.pdf

P PT. Astra Otoparts Tbk. Divisi NUSAMETAL sebagai salah satu perusahaan yang bergerak di bidang industri, mempunyai visi dan misi dalam menjalankan roda perusahaannya. Tujuan dari visi dan misi perusahaan tersebut bertujuan untuk memajukan dan mengembangkan perusahaan.Bracket Pillion Step merupakan salah satu produk yang dihasilkan oleh PT. AstraOtoparts Tbk. Divisi NUSAMETAL, yang termasuk sebagai part yang penting bagi sepeda motor. Proses Produksi produk Bracket Pillion Step dari bahan Alumunium ini sudah memenuhi standard perusahaan dan permintaan pelanggan, hanya saja permasalahannya untuk menjadi barang jadi pada PT. Astra Otoparts Divisi Nusametal ini belum terdapat sama sekali stasiun kerja untuk perakitan Bracket P. Step dengan part-part yang mendukung antara lain Rubber step, Collar MM, Rubber MM, dan lain-lain. Sehingga perlu dirancang sistem kerja perakitan Bracket Pillion Step untuk memenuhi kebutuhan konsumen sebanyak 2500 set per hari atau 5000 pcs per hari.Adapun perancangan yang dilakukan meliputi perancangan sistem kerja, layout kerja, penempatan part-part, perancangan meja dan shutter (peluncur), perhitungan waktu baku serta perhitungan jumlah operator dan stasiun kerja, yang kesemuanya menunjang terwujudnya bagian perakitan Bracket Pillion Step di PT. Astra Otoparts Divisi Nusametal.Kemudian diperoleh sistem kerja yang telah dirancang untuk proses assembly padaproduk Bracket Pillion Step dengan waktu baku:ii Merakit 1Bracket Right P. Step adalah 79.85 detik.ii Merakit 1Bracket Left P. Step adalah 63.35 detik.Lalu pada sistem kerja perakitan ini ditempatkan 3 stasiun kerja dengan 1operator masing­ masing didalamnya sehingga total operator 3 orang/shift pada perakitan Bracket RightPillion Step dan 2 stasiun kerja dengan 1 operator masing-masing didalarnnya sehingga total operator 2 orang per shift pada perakitan Bracket Left Pillion Step.Perancangan ini diharapkan dapat memenuhi target perusahaan dalam memenuhi kebutuhan konsumennya.

P PT.Astra Otoparts Tbk . Nusametal Division, as one of the companies that is moving in industry , have vision and mission in running the wheel of company. The direction of vision and mission of the company have purpose to improve and to advance the company.Bracket Pillion Step which one form output product by PT.Astra Otoparts Tbk.Nusametal Division, are included as an important part for motorcycle. Production Process of Bracket Pillion Step that made from Allumunium is have qualified standard of company and demand of consument, but set of the problem here to make the finish goods at PT.Astra Otoparts Tbk. Nusametal Division haven 't got any work station for Bracket Pillion Step assembling with the parts which is support the Bracket P. Step, and the parts are Rubber Step, Collar MM, Rubber MM, etc. With that problem so need to be designed Bracket Pillion Step Assembling Work Station to fill the demand of the company as many as 2500 set for a day or 5000 pieces for a day.And the work station design which being done including the work system design, work layout design, set parts placement, desk and shutter design for standing work, operation process time calculation, and also consideration amount of operator and work station, which all of it support the realization of Bracket Pillion Step Assembling in PT.Astra Otoparts Tbk. Nusametal Division.And then, after get the work system that being designed to assembling process for Bracket Pillion Step with the fixed time to :ii Assembly 1piece Bracket Right P.Step is 79.85 sii Assembly 1piece Bracket Left P. Step is 63.35 s.And in this assembling work system be located 3 work station with 1 operator each inside so total operators are 3 person I shift in Bracket Right Pillion Step Assembly, and 2 work station with 1 operator each inside so total operators are 2 person I shift in Bracket Left Pillion Step Assembly. This design of work station is hoped to complete the company target within fulfill the consument necessity .

Bagaimana Anda menilai Koleksi ini ?