DETAIL KOLEKSI

Analisis perencanaan pengemasan matriks pada formasi batu gamping di sumur JRR-2 Lapangan Y


Oleh : Mety Anisa

Info Katalog

Nomor Panggil : -

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2015

Pembimbing 1 : Rachmat Sudibjo

Subyek : Productivity - petroleum;Production analysis - petroleum;Petroleum engineering;Acidizing process

Kata Kunci : acidizing, limestone, reservoirs pressure

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2015_TA_TM_07110183_Halaman-Judul.pdf
2. 2015_TA_TM_07110183_Bab-1.pdf 1
3. 2015_TA_TM_07110183_Bab-2.pdf
4. 2015_TA_TM_07110183_Bab-3.pdf
5. 2015_TA_TM_07110183_Bab-4.pdf
6. 2015_TA_TM_07110183_Bab-5.pdf
7. 2015_TA_TM_07110183_Bab-6.pdf
8. 2015_TA_TM_07110183_Daftar-Pustaka.pdf
9. 2015_TA_TM_07110183_Lampiran.pdf

B Bidang Y yang terletak di Karawang, Jawa Barat telah memproduksi sejak Oktober 2004. Produksi rata-rata dalam satu bulan mencapai 9,0 MMSCFD. Tujuan dari penulisan karya ini adalah untuk menganalisis pengasaman matriks yang akan dilakukan untuk JRR-2 baik dimulai dengan suntik perhitungan asam sampai perhitungan waktu selama pengasaman yang pergi. Tekanan Data menunjukkan bahwa baik ini memiliki tekanan reservoir, yaitu 1436 psi dan untuk produksi harian 610.000 scfd. kerusakan formasi yang terjadi dekat lubang sumur di JRR-2 baik dan jenis kerusakan yang diderita oleh ini dengan baik adalah skala deposito telah dibentuk untuk perbedaan tekanan dan suhu. Yang mana dalam perbaikan telah menggunakan metode pengasaman matriks untuk perawatan ini. Metode matriks pengasaman telah terseleksi karena permeabilitas yang dimiliki 75 md. Dengan menggunakan metode ini hasil dari JRR-2 diharapkan meningkat di waktu dan ekonomis.

T The Y field is onshore filed which located in Karawang, West Java has been producing since October 2004. Production average in month reached 9.0 MMSCFD. The aim of masterpiece writing is to analyze the matrix acidizing which will be done for JRR-2 well begin with the calculation injecting of acid until the time calculation during the acidizing go on. The data pressure shown that this well had reservoir pressure, that is 1436 psi and for the daily production is 610000 SCFD. Formation damage that happen near wellbore at JRR-2 well and the type of damage suffered by these well is deposit scale has formed to the difference in pressure and temperature. Which is in the repairs has been used the matrix acidizing method for this treatment. The matrix acidizing method has been selection because the permeability of its by owned 75 md. By using this method the produce of JRR-2 well can be expected to increase in time and economically.

Bagaimana Anda menilai Koleksi ini ?