DETAIL KOLEKSI

Perencanaan casing pemboran pada sumur SGW lapangan GNJ


Oleh : Syehwin Genali Wahab

Info Katalog

Nomor Panggil : 1253/TP/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : Listiana S.

Subyek : Oil well casing;Oil well drilling

Kata Kunci : casing design, planning, maximum load method

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STP_071001500142_Halaman-Judul.pdf
2. 2020_TA_STP_071001500142_Pengesahan.pdf
3. 2020_TA_STP_071001500142_Bab-1_Pendahuluan.pdf
4. 2020_TA_STP_071001500142_Bab-2_Tinjauan-Umum.pdf
5. 2020_TA_STP_071001500142_Bab-3_Metodologi-Penelitian.pdf
6. 2020_TA_STP_071001500142_Bab-4_Hasil-dan-Pembahasan.pdf
7. 2020_TA_STP_071001500142_Bab-5_Kesimpulan.pdf
8. 2020_TA_STP_071001500142_Daftar-Pustaka.pdf
9. 2020_TA_STP_071001500142_Lampiran.pdf

D Dalam usaha eksplorasi migas, dilakukan pekerjaan pemboran dengan cara mendesign lubang formasi sesuai sasaran untuk mendapatkan target dalam formasi, adapun maksud dari melubangi formasi tersebut adalah agar hidrokarbon yang akan diproduksikan keluar dan sampai ke permukaan. Salah satu parameter keberhasilan dari suatu kegiatan pemboran adalah desain casing yang aman secara teknis. Tujuan dari penulisan Tugas Akhir ini adalah menrencanakan desain casing pada sumur”SGW” lapangan “GNJ”. Tujuan dari perencanaan desain casing ini adalah untuk mendapatkan ukuran casing yang tepat terhadap pilihan yang sudah ada, serta memiliki grade casing yang kuat untuk menahan tekanan yang timbul akibat pembebanan casing. Dalam skripsi ini menggunakan metode grafis dan analisa perhitungan. Metode maximum load digunakan untuk menentukan grade yang optimal, sedangkan analisa perhitungan digunakan untuk menentukan harga safety factor dari masing-masing grade casing tersebut. Dari perhitungan beban-beban yang bekerja pada casing serta hasil plot antara beban burst dan collapse, maka akan diketahui apakah casing tersebut tidak aman, cukup aman atau terlalu aman.

I In the oil and gas exploration business, drilling works are carried out by designing the formation hole according to the target to get the target in the formation, while the purpose of perforating the formation is so that the hydrocarbons that will be produced come out and come to the surface. One of the parameters of the success of a drilling activity is the casing design which is technically safe and good in terms of economics. The purpose of writing this Final Project is to evaluate the design of the casing in the "SGW" well "GNJ" field. The purpose of this casing design evaluation is to get the right and economical size of the casing against the existing options, as well as having a strong casing grade to withstand the pressure arising from loading the casing. In this thesis using a graphical method and calculation analysis. The graphical method is used to determine the optimal grade, so that drilling costs can be more economical, while the calculation analysis is used to determine the price of the safety factor of each grade of the casing. From the calculation of the loads that work on the casing and the results of the plot between burst and collapse loads, it will be known whether the casing pipe is not safe, safe enough or too safe so that it can cause danger.

Bagaimana Anda menilai Koleksi ini ?