DETAIL KOLEKSI

Desain dan evaluasi matrix acidizing sumur A, B, dan C dilapangan Y

5.0


Oleh : Brian Tony

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2016

Pembimbing 1 : Rachmat Sudibyo

Pembimbing 2 : M.G Sri Wahyuni

Subyek : Injecting Fluid - Matrix Acidizing

Kata Kunci : scale precipitated, stimulation, matrix acidizing

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TM_07112045_Bab-3.pdf
2. 2016_TA_TM_07112045_Bab-4.pdf
3. 2016_TA_TM_07112045_Bab-5.pdf
4. 2016_TA_TM_07112045_Bab-6.pdf
5. 2016_TA_TM_07112045_Lampiran.pdf
6. 2016_TA_TM_07112045_Daftar-Pustaka.pdf
7. 2016_TA_TM_07112045_Bab-1.pdf
8. 2016_TA_TM_07112045_Halaman-Judul.pdf
9. 2016_TA_TM_07112045_Bab-2.pdf

T Tingkat rendah Yah A, Well B, dan produktivitas Nah C dapat diatasi dengan beberapa cara, dari menggantikan yang lama pompa submersible listrik (ESP) yang telah melalui skala diendapkan ke yang baru, untuk matriks pengasaman. Matrix pengasaman yang diaplikasikan Nah A, Well B, dan C Nah, itu dilakukan dengan menyuntikkan asam cairan ke dalam formasi mereka di bawah patah tekanan formasi mereka. Throug cara ini, asam akan menyebar ke dalam formasi batuan radial, dan sebagai particels yang menyumbat pori-pori di sekitar sumur tersebut akan dibubarkan. Matriks pengasaman dilakukan di setiap Yah; Nah A pada Juni, 2 2015, Sumur B pada Mei, 5 2010, dan Sumur C pada Februari, 26 2010. Materi yang asam yang digunakan pada mereka memiliki bahan dasar yang sama, yaitu HCl. Hal itu disuntikkan secara bertahap berdasarkan program stimulasi mereka. Setelah langkah terakhir, ditemukan bahwa produksi tingkat Nah A, Well B, dan C Nah meningkat. Oleh karena itu, matriks pengasaman yang diterapkan kepada mereka juga berhasil.

T The low degree of Well A, Well B, and Well C productivity can be addressed by some ways, from replacing the old electric submersible pump (ESP) which had through scale precipitated into a new one, to matrix acidizing. Matrix acidizing which was applied to Well A, Well B, and Well C, was done by injecting fluid acid into their formation under their formation fracturing pressure. Throug this way, the acids will spread into the rock formation radially, and so as the particels that are clog the pores around the sumur will be dissolved. The matrix acidizing was done in each Well; Well A on June, 2nd 2015, Sumur B on Mei, 5th 2010, and Sumur C on Februari, 26th 2010. The acid material used on them has the same basic material, which is HCl. It was injected gradually based on their stimulation program. After the last step, it was found that the level production of Well A, Well B, and Well C were increased. Therefore, the matrix acidizing which is applied to them was also succeed.

Bagaimana Anda menilai Koleksi ini ?