DETAIL KOLEKSI

Perencanaan sistem instalasi pipa distribusi air bersih, instalasi pipa air kotor, instalasi pipa air buangan dan instalasi pipa vent di Apartemen Arandra Residence, Jakarta

3.0


Oleh : Herickson Manumpak

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Husein Abdul Aziz

Subyek : Pipelines - Design and construction;Water supply

Kata Kunci : plumbing, clean water, dirty water, waste water, vent, volume

Status Posting : Published

Status : Tidak Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_STM_06112001_Halaman-Judul.pdf 12
2. 2019_TA_STM_06112001_Lembar-Pengesahan.pdf 3
3. 2019_TA_STM_06112001_Bab-1_Pendahuluan.pdf 4
4. 2019_TA_STM_06112001_Bab-2_Tinjauan-Pustaka.pdf
5. 2019_TA_STM_06112001_Bab-3_Metodologi-Penelitian.pdf
6. 2019_TA_STM_06112001_Bab-4_Analisis-Hasil-dan-Pembahasan.pdf
7. 2019_TA_STM_06112001_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2019_TA_STM_06112001_Lampiran.pdf

S Sistem plambing adalah bagian yang sangat penting dalam bangunangedung bertingkat tinggi. Dimana sistem plambing meliputi sistem instalasi pipadistribusi air bersih, sistem instalasi pipa air kotor, sistem instalasi pipa airbuangan dan juga sistem instalasi pipa vent. Dalam hal ini, bangunan bertingkatyang dimaksud adalah bangunan minimal empat lantai yaitu hotel, apartemen,perkantoran dan pusat perbelanjaan (mall). Ketersediaan air bersih sangatmenunjang pengguna gedung. Dalam perencanaan Sistem plumbing harus sesuaidengan standar pedoman plumbing Indonesia. Apartemen Arandra ResidencesJakarta adalah salah satu bangunan bertingkat tinggi yang sedang dalampelaksanaan kontruksi. Apartemen Arandra Residence dengan tinggi bangunan24 lantai dengan luas per lantai 1.081,3 m2, memiliki jumlah penghuni 1557orang, membutuhkan air bersih sebesar 374 m3/hari. Untuk pemdistribusian airyamg maksimal, dilakukan perhitungan diameter pipa dari peralatan plumbingyang terpasang dengan laju Aliran air yaitu 2 m/s. Maka perhitungan kapasitasvolume Ground Water Reservoir (GWR) dibutuhkan adalah 236 m3 dan VolumeRooftank yang dibutuhkan adalah 35 m3. Sedangkan kapasitas pompa utama yangdigunakan untuk mengalirkan air bersih dari Ground Water Reservoar (GWR) keRooftank adalah 1,25 m3/menit. Dari perihitungan tersebut dapat diketahui nilaiproyek instalasi pipa air bersih, instalasi pipa air kotor, instalasi pipa air buangandan instalasi pipa vent adalah Rp 3.922.717.613.

T The plumbing system is a very important part of high-rise buildings. Where theplumbing system includes a clean air distribution pipe installation system, dirtywater pipe installation system, sewage pipe installation system and vent pipeinstallation system. In this case, the multi-storey building is called a four-storeybuilding, namely hotels, apartments, offices and shopping centers (malls). Theavailability of clean water greatly supports building users. In planning theplumbing system must be in accordance with “Pedoman Plumbing Indonesia”.Apartment Arandra Residences Jakarta is one of the high-rise buildings that areunder construction. Arandra Residence Apartment with a height of 24 floors withan area of 1081,3 m2 per floor, has a total of 1557 people, requires clean air of374 m3 / day. For maximum distribution of clean water, a pipe diametercalculation from the plumbing equipment is installed with a water flow rate of 2m /s. Then the volume capacity of the Water Reservoir Ground (GWR) requiredis 236 m3 and Rooftank Volume required is 35 m3. While the main pump capacityused to drain clean water from the Water Reservoir (GWR) to Rooftank is 1,25m3 / minute. Clean air distribution system starting from the 20th floor to the 1stfloor by going ,from the 24rd floor to the 22st floor using the help of a boosterpump. Then from the data obtained the value of the project of clean water pipeinstallation, sewage pipe installation, sewage pipe installation and vent pipeinstallation is Rp 3.922.717.613.

Bagaimana Anda menilai Koleksi ini ?