DETAIL KOLEKSI

Evaluasi hidrolika lumpur pemboran pada sumur "s" lapangan "w"


Oleh : Silvia Wardani

Info Katalog

Nomor Panggil : 1113/TP/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Lilik Zabidi

Pembimbing 2 : Apriandi Rizkina

Subyek : Petroleum engineering - Hydraulic drilling

Kata Kunci : cutting, drilling of mud hydraulics, horse power

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TM_071001500138_Halaman-Judul.pdf 17
2. 2019_TA_TM_071001500138_Bab-1.pdf 3
3. 2019_TA_TM_071001500138_Bab-2.pdf 23
4. 2019_TA_TM_071001500138_Bab-3.pdf 6
5. 2019_TA_TM_071001500138_Bab-4.pdf 11
6. 2019_TA_TM_071001500138_Bab-5.pdf
7. 2019_TA_TM_071001500138_Daftar-Putaka.pdf 1
8. 2019_TA_TM_071001500138_Lampiran.pdf

L Lumpur pemboran menjadi salah satu pertimbangan dalam mengoptimalkan operasi permboran. Dalam operasi pemboran selalu diinginkan laju penembusan yang tinggi. Hal ini dipengaruhi oleh beberapa faktor seperti formasi batuan yang ditembus, hidrolika lumpur, hidrolika bit, serta sistem lumpur yang digunakan. Tujuan dari penelitian ini adalah untuk mengevaluasi pengangkatan serpih bor pada sumur “S” yang selanjutnya dilakukan untuk mengetahui pembersihan lubang sumur.Metode yang digunakan dalam mengevaluasi keberhasilan hidrolika pahat dilakukan dengan menggunakan perhitungan kehilangan tekanan, horse power pada bit dan penentuan nozzle pada operasi pemboran tersebut. Pada evaluasi pengangkatan cutting akan dilakukan dengan menggunakan tiga metode yaitu, Cutting Transport Ratio(FT), Cutting Concentration(Ca), dan Cutting Carrying Index (CCI)Pada evaluasi hidrolika pemboran dan pengangkatan cutting didapatkan beberapa parameter yang berpengaruh yaitu sifat fisik lumpur pemboran (densitas, viskositas, plastic viscosity dan yield point), tekanan dan debit pompa. Selain itu kecepatan alir fluida dan pola aliran yang terbentuk pada operasi pemboran tersebut dapat mempengaruhi pembersihan lubang. Parameter yang terdapat pada sumur ini memilki nilai yang baik dengan ditandainya hasil kehilangan tekanan tidak melebihi pressure stand pipe yang digunakan ,nilai ECD lebih besar dari nilai densitas yang digunakan, nilai pada bit horse power nya memiliki nilai diatas 50% dan penggunaan ketiga metode pengangkatan cutting tersebut sesuai dengan spesifikasi yang diinginkan.Berdasarkan hasil evaluasi hidrolika yang dilakukan pada trayek 12.25 inci didapatkan bahwa operasi hidrolika pemboran sumur “S” ini sudah baik, karena ditandai dengan nilai Bit Horse Power yang baik pada kedalaman 5600 ft didapatkan sebesar 67%, pada kedalaman 6642 ft didapatkan sebesar 58% dan pada kedalaman 7784ft sebesar 73%. Hal ini dipengaruhi oleh desain lumpur pemboran pada sumur “S” yang sudah baik dan pemilihan jenis pompa yang sudah baik. Besarnya Cutting Transport Ratio (Ft) yang telah didapatkan sebesar 96.57 – 99.49% ,Cutting Concentration (Ca) sebesar 1.585 – 5.063 %, dan Cutting Carrying Index (CCI) sebesar 1.324 – 10.777.

D Drilling mud is one of the considerations in optimizing drilling operations. In drilling operations a high withdrawal rate is always desirable. This is caused by several factors such as penetrated rock formations, mud hydraulics, bit hydraulics, and also the sludge system used. The purpose of this study was to study the removal of shale drill bits in the "S" well which was then carried out to find hole wells.The method used in the success of winning tool hydraulics is done by using the calculation of pressure drop, horsepower on the bit and determining the nozzle on the drilling operation. The evaluation of the cutting will be carried out using three methods, namely, Cutting Transport Ratio (FT), Cutting Concentration (Ca), and Cutting Carrying Index (CCI)In the assessment of drilling hydraulics and removal of cut obtained several parameters collected, namely the physical properties of drilling mud (density, viscosity, plastic viscosity and yield point), pump pressure and discharge. In addition to fluid flow rates and flow patterns formed in this drilling operation can facilitate the hole. The parameters needed in this well have a good value with the mark of the results Pressure no more than the pressure pipe used, the ECD value is greater than the value of density used, the value of small horsepower With a 50% added value and the use of the method of lifting the cutting according to desired specifications.Based on the results of the hydraulic evaluation carried out on the 12.25- inch route, it is found that the hydraulic drilling operation of "S" well is good, because it is combined with a good Bit Horse Power at 5600 feet obtained at 67%, at an altitude of 6642 feet it is 58 % and at a depth of 7784ft of 73%. This is urgent by the design of drilling mud in the "S" well that is already good and the selection of the type of pump that is already good. The Transportation of Large Cutting Ratio (Ft) which has been obtained is 96.57 - 99.49%, Concentration Cutting (Ca) is1.585 - 5.063%, and Cutting Cutting Index (CCI) is 1.324 - 10.777.

Bagaimana Anda menilai Koleksi ini ?