DETAIL KOLEKSI

Penentuan isi awal gas di tempat reservoir HH lapangan Y dgn menggunakan metode material balance


Oleh : Hendri Helmiyanto

Info Katalog

Nomor Panggil : 1428/TP/2022

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2022

Pembimbing 1 : Mulia Ginting

Pembimbing 2 : Aqlyna Fattahanisa

Subyek : Petroleum reservoirs

Kata Kunci : original gas in place, material balance, software MBAL

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2022_TA_STP_071001400073_Halaman-Judul.pdf
2. 2022_TA_STP_071001400073_Lembar-Pengesahan.pdf
3. 2022_TA_STP_071001400073_Bab-1_Pendahuluan.pdf
4. 2022_TA_STP_071001400073_Bab-2_Tinjauan-Literatur.pdf
5. 2022_TA_STP_071001400073_Bab-3_Kerangka-Konsep.pdf
6. 2022_TA_STP_071001400073_Bab-4_Metode.pdf
7. 2022_TA_STP_071001400073_Bab-5_Kesimpulan.pdf
8. 2022_TA_STP_071001400073_Daftar-Pustaka.pdf
9. 2022_TA_STP_071001400073_Lampiran.pdf

R Reservoir HH merupakan reservoir gas yang terletak di daerah wilayahJabung, Jambi. Reservoir HH berproduksi sejak Juli 2015 sampai dengan saat ini,dengan jumlah total produksi sebesar 1996,92 MMscf. Reservoir HH dilakukanperhitungan isi awal gas di tempat serta sisa gas yang dapat diproduksikan untukmengetahui jangka waktu reservoir HH sanggup untuk berproduksi. Berdasarkanpenelitian, reservoir HH termasuk dalam jenis reservoir dry gas reservoir dengantenaga dorong berupa depletion drive. Perhitungan isi awal gas reservoir HHdenganmenggunakan metode material balance P/Z vs GP dengan terintegrasi softwareMBAL didapatkan nilai isi awal gas sebesar 4156,84 MMscf. Berdasarkan nilaitekanan abandon sebesar 130 psia reservoir HH memiliki isi awal gas maksimumyang dapat diproduksikan atau estimate ultimate recovery sebesar3942,42 MMscf,dengan nilai recovery factor sebesar 94,84 % dan sisa gas yang dapat diproduksikanoleh reservoir HH pada Juli 2018 berdasarkan jumlah isi awalgas di tempat (GIIP)dengan software MBAL yaitu sebesar 1945,5 MMscf atau setara 1,9 Bscf. Dengantarget produksi harian reservoir HH sebesaar 1 MMscf maka berdasarkanperhitungan platue time reservoir HH mampu berproduksi sampai 14 Februari2004

R Reservoir HH is a gas reservoir located in the Jabung region, Jambi.Reservoir HH has been in production since July 2015 until now, with a totalproduction of 1996.92 MMscf. HH Reservoir is calculated the initial gas content inplace as well as the remaining gas that can be produced to determine the length oftime the HH reservoir is able to produce. Based on research, HH reservoirs areincluded in the dry gas reservoir reservoir with the thrust in the form of a depletiondrive. Calculation of the initial contents of the HH reservoir gas using the materialbalance method P / Z vs GP with integrated MBAL software obtained the initial gasfill value of 4156.84 MMscf. Based on the abandonment pressure value of 130 psiaHH reservoir has a maximum initial gas content that can be produced or estimatedultimate recovery of 3942.42 MMscf, with a recovery factor value of 94.84% andthe remaining gas that can be produced by the HH reservoir in July 2018 based onthe amount the initial contents of the gas in place (GIIP) with MBAL software thatis equal to 1945.5 MMscf or equivalent to 1.9 Bscf. With a daily HH reservoirproduction target of 1 MMscf, based on the calculation of a reservoir HH time frameit is capable of producing until February 14, 2004.

Bagaimana Anda menilai Koleksi ini ?