DETAIL KOLEKSI

Perencanaan instalasi pipa distribusi air bersih, instalasi pipa air kotor, instalasi pipa air buangan dan instalasi pipa vent Apartemen Grand Dhika City, Jatiwarna

1.3


Oleh : Tommy Wibowo Trisno

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Husein Abdul Aziz

Subyek : Hydraulic structures;Water supply

Kata Kunci : plumbing, clean water, sewage water, grey water, vent, volume

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_STM_061001500087_Halaman-Judul.pdf 11
2. 2019_TA_STM_061001500087_Lembar-Pengesahan.pdf 4
3. 2019_TA_STM_061001500087_Bab-1_Pendahuluan.pdf 3
4. 2019_TA_STM_061001500087_Bab-2_Tinjauan-Pustaka.pdf
5. 2019_TA_STM_061001500087_Bab-3_Metodologi-Penelitian.pdf
6. 2019_TA_STM_061001500087_Bab-4_Analisis-dan-Pembahasan.pdf
7. 2019_TA_STM_061001500087_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2019_TA_STM_061001500087_Daftar-Pustaka.pdf 1
9. 2019_TA_STM_061001500087_Lampiran.pdf

S Sistem plambing adalah bagian yang sangat penting dalam bangunangedung bertingkat tinggi minimal 4 lantai. Dimana sistem plambing meliputiinstalasi pipa disstribusi air bersih, instalasi pipa air kotor, instalasi pipa air buangandan juga instalasi pipa vent. Perencanaan ini menggunakan “Sistem Plambing SNI03 – 6481-2000”,dan “Sistem Plambing SNI 03-7065-2005”. Dalam perencanaansistem plambing harus sesuai dengan standar yang telah dikaji oleh Badan StandarNasional agar sistem plambing dalam gedung dapat berkerja dengan baik.Apartemen Grand Dhika City, Jatiwarna adalah salah satu bangunan bertingkattinggi yang sedang dalam pelaksanaan kontruksi. Apartemen Grand Dhika Citymemiliki tinggi bangunan 21 lantai dengan luas per lantai 660 m2. Untukpendistribusian air bersih yang maksimal, dilakukan perhitungan diameter pipa dariperalatan plambing yang terpasang dengan laju aliran air yaitu 2,2 m/s. Denganperhitungan luas efisien gedung maka didapatkan jumlah maksimum penghunigedung 1386 orang, dan membutuhkan air bersih sebesar 416 m3/hari. Dari jumlahpenghuni tersebut, maka kapasitas volume Ground Water Reservoar (GWR) yangdibutuhkan adalah 150 m3 dan Volume Roof Tank yang dibutuhkan adalah 56,5 m3.Sedangkan untuk mengisi roof tank berdasar kebutuhan puncak dibutuhkankapasitas pompa utama yang digunakan untuk mengalirkan air bersih dari GroundWater Reservoir (GWR) adalah 1,04 m3/menit. Maka dari data yang didapat nilaiproyek instalasi pipa air bersih, instalasi pipa air kotor, instalasi pipa air buangan,dan instalasi pipa vent adalah Rp 3.047.794.468.

P Plumbing system is a very important part in high-rise buildings of at least 4floors. Where the plumbing system includes the installation of clean waterdistribution pipes, installation of dirty water pipes, installation of waste water pipesand also installation of vent pipes. This design using “Sistem Plambing SNI 03 –6481-2000”,dan “Sistem Plambing SNI 03-7065-2005”. In planning the plumbingsystem must be in accordance with standards that have been reviewed by theNational Standards Agency for the plumbing system can running well. Grand DhikaCity Apartment, Jatiwarna is one of the high-rise buildings that is currently underconstruction. Grand Dhika City Apartment have building height of 21 floors withan area of 660 m2 per floor. For maximum distribution of clean water, a pipediameter calculation from the plumbing equipment is installed with a water flow rate of 2.2 m /s. With the calculation of the efficient area of the building, themaximum number of occupants of the building is 1386 people, and requires cleanwater of 416 m3 / day. From the number of occupants, the required Ground WaterReservoir (GWR) volume capacity is 150 m3 and the required Roof Tank Volumeis 56.5 m3. Meanwhile, to fill the roof tank based on peak demand, the capacity ofthe main pump used to drain clean water from the Ground Water Reservoir (GWR)is 1.04 m3 / minute. Then from the data obtained the value of clean water pipeinstallation projects, dirty water pipe installations, waste water pipe installations,and vent pipe installations is Rp 3,047,794,468.

Bagaimana Anda menilai Koleksi ini ?