Evaluasi penyebab pipa terjepit pada trayek 8 1/2 di Sumur "M" Lapangan "X".


Oleh : Astia Akrimah

Info Katalog

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2015

Pembimbing 1 : Ali Sundja

Pembimbing 2 : Bayu Satyawira

Subyek : Well-drilling;Water base mud

Kata Kunci : Water base mud, well drilling, drilling time

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2015_TA_TM_07110057_Halaman-judul.pdf 17
2. 2015_TA_TM_07110057_Bab-1.pdf 2
3. 2015_TA_TM_07110057_Bab-2.pdf
4. 2015_TA_TM_07110057_Bab-3.pdf
5. 2015_TA_TM_07110057_Bab-4.pdf
6. 2015_TA_TM_07110057_Bab-5.pdf
7. 2015_TA_TM_07110057_Bab-6.pdf
8. 2015_TA_TM_07110057_Daftar-pustaka.pdf
9. 2015_TA_TM_07110057_Lampiran.pdf

D Dalam operasi pengeboran sumur di Lapangan X, ditemui berbagai masalah yang menghambat jalannya operasi pengeboran. Salah satu masalah yang dihadapi di sumur pengeboran adalah pipa bor seri M terjepit. sirkuit pipa bor yang macet akan menghambat selesainya sumur yang akan menghasilkan peningkatan waktu dan biaya pengeboran yang direncanakan.Dalam tesis ini akan diperiksa pada penyebab pinching sirkuit pipa bor dan penanggulangan yang telah dilakukan. Hal-hal - hal-hal yang bisa menyebabkan pipa mengepel seperti, aspek hidrolika, lumpur, stabilitas lubang bor, dan tipe batuan litologi formasi batuan juga. Tipe - jenis pipa mengepel seperti lengket, lengkung, jok, dan sebagainya. Metode yang dilakukan dalam mengatasi pipa yang dikepang sebagai metode yang lemah, peredaran, perendaman, dan metode terakhir mundur. Evaluasi yang dilakukan dalam tesis ini berkaitan dengan tekanan tiba-tiba naik dan torsi naik dengan itu karena ada indikasi packoff. Metode WOP (Work On Pipe). Hal ini dilakukan agar operasi pengeboran terus berlanjut dan selesainya sumur bisa dilakukan dengan baik. Pipa sumbat di lintasan sumur M terjadi pada 8 ½ "dengan klasifikasi tidak optimal karena lubang kering HWDP yang bocor.

i in the well drilling operation in the Field X, encountered various problems that impede the course of the drilling operation. One of the problems encountered in drilling wells are pinched M series drill pipe. stuck drill pipe circuit would hamper completion of wells that will result in increased time and cost of the planned drilling.In this thesis will be examined on the cause pinching of drill pipe circuit and countermeasures that have been done. Things - things that can cause a pipe clenched like, aspects of hydraulics, mud, borehole stability, and lithology types of rock formations as well. Type - the type of pipe clenched like diffrential sticking, mechanical, key seat, pack off. The method is performed in tackling pipe clenched as tenuous method off, circulation, immersion, and the last method back off. Evaluation was conducted in this thesis is related to the pressure suddenly rises and torque rise with it because there is an indication packoff. Method does WOP (Work On Pipe). This is done, so that operations can be continued drilling and completion of wells can be done well. Stuck pipe in the well trajectory M occurs on 8 ½ "by classification is not optimal due to leakage HWDP dry hole.