DETAIL KOLEKSI

Kajian pengupasan lapisan tanah penutup dengan sistim backhoe dan truck di tambang batubara PT Astirindo Gita Mandiri kabupaten Lima Puluh kota Sumatra Barat


Oleh : Fandi wan ranto

Info Katalog

Nomor Panggil : 285/TT/2013

Penerbit : FTKE - Usakti

Kota Terbit : jakarta

Tahun Terbit : 2013

Pembimbing 1 : Syamidi Patian

Pembimbing 2 : pancanita novi hartimi

Subyek : Coal Mines And Mining

Kata Kunci : -

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2016_TA_TB_07306009_HALAMAN-JUDUL.pdf
2. 2016_TA_TB_07306009_BAB-I.pdf
3. 2016_TA_TB_07306009_BAB-II.pdf
4. 2016_TA_TB_07306009_BAB-III.pdf
5. 2016_TA_TB_07306009_BAB-IV.pdf
6. 2016_TA_TB_07306009_BAB-V.pdf
7. 2016_TA_TB_07306009_BAB-VI.pdf
8. 2016_TA_TB_07306009_BAB-VII.pdf
9. 2016_TA_TB_07306009_DAFTAR-PUSTAKA.pdf
10. 2016_TA_TB_07306009_LAMPIRAN.pdf

- -

B Based on Exploration and Mining Coal Concessions of PT Astrindo Gita Mandiri No.919/BLK/2005 on Desember 28 2005 the area of Coal Concessions is 262,5 Ha located in Jorong Koto Tuo, Kenagarian Koto Lamo, Kecamatan Kapur IX, Kabupaten Lima Puluh Kota, West Sumatera Province. Geografically loacted in 100º 31’34’’ East Longitude until 100º 31’27’’ East Longitude and 00º 09’35’’South Latitude until 00º 09’09’’ South Latitude. PT AGM is a coal mining company using conventional open pit method, which is combining loading and hauling equipment. Production equipment in mining operation is an important tools to achieve target production in the of the term of mining operation. It is important to estimating the production of hauling and loading equipment to achive the company target production. Observation that I have done is analyzing the productivity of loading and hauling equipment in mining operation, Observate the matching of loading and hauling equipment, also reccomend the using of hauling and loading equipment in Overburden Removal to achieve the planned target production. Production target of 68 181 LCM stripping OB / month, so that production targets overburden per hour was 340.9 LCM / hour. Production equipment Kobelco SK 330 excavator loading is 272.2 LCM / hour, the amount needed 2 units bringing the total production to 544.44 at LCM / hour. Jumbo DT production Hino Ranger is 53.74 LCM / hour, so the backhoe and truck production system is 376.18 LCM / hour, the amount of the required 7 units and in total production amounted to 376.18 LCM / hour is a little higher than production targets set by the OB company. MF value amounting to 0.69, because the value of MF <1 then FK = 0.69, means of transportation and unloading equipment is always busy and there is time to wait. Percent exceeded the target of 10.34% is obtained.

Bagaimana Anda menilai Koleksi ini ?