Rancangan perawatan Mesin L-Box dengan Metode Reliability Centered Maintenance (RCM) pada PT. Argo Pantes Tbk.
P PT.Argo Pantes Tbk. merupakan perusahaan yang bergerak dibidang industri textile yang memproduksi 3 produk yaitu benang celup, kain tenun dan kain celup. Perusahaan memiliki 3 lantai produksi yaitu yarn processing, weaving processing, dan fabric processing. Permasalahan yang terjadi saat ini pada perusahaan yaitu tingginya downtime pada machine. Fabric processing merupakan lantai produksi yang memiliki permasalahan downtime machine tertinggi, upaya yang dilakukan untuk meminimasi downtime yaitu menyusun strategi perawatan mesin. Reliability Centered Maintenance merupakan metode untuk memilih, mengembangkan, dan membuat alternatif strategi perawatan berdasarkan kriteria operasional. Berdasarkan diagram paretto, ditemukan mesin yang memiliki downtime terbesar dan komponen paling kritis. Mesin yang memiliki downtime tertinggi yaitu mesin L-Box, dimana mesin terdiri dari L-Box 1 dan L-Box 2 yang digabungkan secara parallel. L-Box 1 berfungsi untuk pencucian kain dan L-Box 2 untuk proses bleaching. Mesin L-Box 1 dan L-Box 2 memiliki waktu downtime sebesar 12000,7 menit. Hasil analisis FMEA ditemukan komponen dengan nilai RPN tertinggi yaitu komponen roller, guide roll, rubber roll dan bearing. Tahap pemilihan perawatan menentukan perawatan pada komponen, komponen roller, guide roll, rubber roll dan bearing mendapatkan pemeliharaan Time Directed keempat komponen tersebut memiliki interval pergantian pencegahan, untuk komponen bearing adalah 27 hari, roller 27 hari, guide roll 44 hari dan rubber roll 32 hari.
P PT. Argo Pantes Tbk. is a company that specialized in textile industry that produced 3 products, there is dye yarn, woven fabric, and dye fabric. The company has 3 production floor, that is yarn processing, weaving processing, and fabric processing. The problem that occurs at this time is high level downtime of machine.Fabric processing is a production floor that has a problem with high level of downtime machine, the effort is to minimize the downtime that is arranging a strategy for machine treatment. Reliability Centered Maintenance is a method to choose, improve, and create an alternative treatment strategy based on operational criteria. According to paretto diagram, found the machine that has the largest downtime and the most critical component. The machine that has the highest downtime is L-Box machine where the machine consist of L-Box 1 and L-Box 2 that combined with a parallel. The function of L-Box 1 is to wash the fabric and L-Box 2 for bleaching process. Both L-Box 1 and L-Box 2 machine has a 12000, 7 minute breakdown time. Analysis of FMEA describe the critical component based on the highest RPN assessment, the critical components are roller, guide roll, rubber roll and bearing. The step of choosing treatment decide the treatment for the component, roller component, guide roll, rubber roll, and bearing receive Time Directed treatment, and obtain prevention exchange interval for 3 component, that is bearing component with 27 days, roller with 27 days, guide roll with 44 days and rubber roll with 32 days