DETAIL KOLEKSI

Analisis workflow dalam Bim Execution Plan (BEP) pada proyek konstruksi

2.8


Oleh : Muhammad Ilham Ramadhan

Info Katalog

Penerbit : FTSP - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Raflis

Subyek : Construction project;Workflow

Kata Kunci : workflow, building information modelling

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STS_051001500080_Halaman-Judul.pdf
2. 2020_TA_STS_051001500080_Lampiran.pdf
3. 2020_TA_STS_051001500080_Bab-1_Pendahuluan.pdf 4
4. 2020_TA_STS_051001500080_Bab-2_Tinjauan-Pustaka.pdf
5. 2020_TA_STS_051001500080_Bab-3_Metodologi-Penelitian.pdf
6. 2020_TA_STS_051001500080_Bab-4_Analisis-Pengolahan-Data.pdf
7. 2020_TA_STS_051001500080_Bab-5_Kesimpulan-Dan-Saran.pdf
8. 2020_TA_STS_051001500080_Daftar-Pustaka.pdf 1
9. 2020_TA_STS_051001500080_Lembar-Pengesahan.pdf 5

D Dalam menentukan Workflow Building Information Modelling (BIM) di dalam BIM Execution Plan (BEP) pada proyek konstruksi, banyak hal yang akan berpengaruh terhadap penentuannya. Pengaruh terhadap Variabel Metodologi Penelitian, Permodelan, Kolaborasi Antar Disiplin dan Hambatan telah dibuktikan kesesuaiannya dengan hasil wawancara terstruktur/kuesioner yang didapatkan. Selanjutnya didalam variabel – variabel tersebut terdapat item – item yang berpengaruh dalam menganalisis Workflow BIM. Penelitian ini bersifat eksploratori dengan metode penelitian yang digunakan adalah kualitatif, dalam pencarian data – data terkait penelitian ini menggunakan Wawancara Terstruktur/Kuesioner serta dimodelkan dengan aplikasi NVivo. Dari hasil analisis data, didapatkan bahwasannya terdapat 1 variabel dan 2 item empiris yang ditemukan setelah Wawancara Terstruktur/Kuesioner, yaitu Variabel Jenis Proyek yang telah dibuktikan dan Item Kesalahan Penggunaan Software serta Item Perpanjangan Lisesnsi Kepemilikan Software Tahunan sebagai item yang telah diteliti lebih lanjut.

I In determining the Workflow Building Information Modeling (BIM) in the BIM Execution Plan (BEP) on a construction project, many things will affect its determination. The influence on the Variables of Research Methodology, Modeling, Interdisciplinary Collaboration and Barriers has been shown to suit the results of the structured interview / questionnaire obtained. Furthermore, in these variables there are items that have an effect on analyzing the BIM workflow. This research is exploratory with the research method used is qualitative, in the search for data related to this study using structured interviews / questionnaires and modeled with the NVivo application. From the results of data analysis, it was found that there were 1 variable and 2 empirical items found after the Structured Interview / Questionnaire, namely the Proven Project Type Variable and Software Usage Error Items and Annual Software Ownership License Extension Items as items that had been further investigated

Bagaimana Anda menilai Koleksi ini ?