Perencanaan pipa induk sistem penyaluran air buangan di Citra Indah Jonggol Bogor sampai akhir tahun perencanaan


Oleh : Indaria Fitridyanti

Info Katalog

Penerbit : FALTL - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2007

Pembimbing 1 : Samsulhadi

Pembimbing 2 : Ramadhani Yanidar

Subyek : Pipe - Sewerage system

Kata Kunci : sewage flow, main sewer, sewerage system, investment cost

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2007_TA_STL_08202019_Halaman-Judul.pdf 26
2. 2007_TA_STL_08202019_Bab-1.pdf 3
3. 2007_TA_STL_08202019_Bab-2.pdf
4. 2007_TA_STL_08202019_Bab-3.pdf
5. 2007_TA_STL_08202019_Bab-4.pdf
6. 2007_TA_STL_08202019_Bab-5.pdf
7. 2007_TA_STL_08202019_Bab-6.pdf
8. 2007_TA_STL_08202019_Bab-7.pdf
9. 2007_TA_STL_08202019_Bab-8.pdf
10. 2007_TA_STL_08202019_Bab-9.pdf
11. 2007_TA_STL_08202019_Daftar-Pustaka.pdf
12. 2007_TA_STL_08202019_Lampiran.pdf

C Citra Indah merupakan kawasan perumahan seluas kurang lebih 600 ha yang terletak sebelah selatan Jakarta di wilayah timur Cibubur kabupaten Bogor, Propinsi Jawa Barat. Perencanaan pengembangan jaringan pipa lnduk Sistem Penyaluran Air Buangan ini direncanakan melayani 100% penduduk hingga lahan terisi pen uh.Sistem penyaluran air buangan di Citra Indah sampai akhir tahun perencanaan direncanakan dapat melayani penduduk total 60000 jiwa. Faktor hari maksimum 1,34 dan persentase air buangan didapat dengan mengadakan perbandingan dengan kawasan di perumahan Bukit Mutiara Balikpapan Kalimantan Timur yaitu sebesar 78 %. Debit Rata-rata air buangan akhir tahun perencanaan sebesar I ,4 L/dtk/1 OOOjiwa.Pemilihan jalur altematif I diplih jalur sistem penyaluran air buangan yang lebib banyak melewati jalan utama yang padat akan perumaban, menyebarangi sungai Cibodas sehingga harus menggunakan bangunan pelengkap yaitu siphon. Jalur alternatifII merupakan sistem penyaluran air buangan yang mempunyai jalur terbagi menjadi dua, yaitu sebagian besar melewati kawasan hunian dan komersial yang cukup padat dan ada sebagian yang tidak melewati jalan utama Citra lndah. Alternatif II juga menyebarangi sungai Cibodas, sehingga harus menggunakan bangunan pelengkap yaitu siphon. Sedangkan jalur alternatif Ill jalur sistem penyaluran air buangan hampir sama dengan alternatif Il tetapi jaringan pipa air buangan menuju 2 IPAL dengan letak yang berbeda. Alternatifjalur pipa yang terpilih adalah altematif HI karena panjang pipa yang digunakan lebih pendek, tidak menggunakan shipon, dan biaya investasi lebih rendah.Total investasi rencana sistem penyaluran air buangan + IPAL sebesar Rp.68.375.513.638,00 dengan diameter yang digunakan 200 mm-500 mm, jumlah manhole 51 buah, dan perlengkapan lain berupa 2 buah bangunan gelontor. Pentahapan pada alternetif ini dibagi 2 tahap yaitu tahap I melayani 24,67% dan Tahap II melayani 75,33% denganrincian biaya alternatif terpi lih tahap r sebesar Rp 22.952.339.311,00 dan tahap 11 sebesar Rp45.423.174.327,00 dengan perhitungan biaya per meter pipa sebesar Rp 5.182.472,00 Imatau sebesar Rp 4.558.368,00 /sambungan rumah.

C Citra Indah is housing regional by more and leas 600 ha which located beside South Jakarta in East Cibubur Bogor Regency, West Java Province. Main sewer pipe network system is planned to service 100% population until this area is full contended.Main Sewer System in Citra lndah until end year planning is planned to service total population amount 60,000 inhabitant. Maximum day factor 1.34 and percentage of drainage water is obtained by establish comparing by region in Bukit Mutiara Housing in East Kalimantan that is 78%. Sewage average flow for end year planning amount 1.4 L/sec/l 00 persons.The first alternative route of Main sewer system is through main road which dense of housing, cross Cibodas river, so must use supporting pipe that is siphon. The Second alternative route is divided become two, as part through resident and commercial area which enough density and other area through main road of Citra Indah. The second alternative is also cross Cibodas river, so it must use the supporting pipe, siphon. Whereas to the third alternative route which is identical by second alternative but main pipe direct to 2 Waste Water Treatment Plants (WWTP) by different location. This third alternative route is shortest if compared by alternative route I and IL lhe third alternative is chosen because has pipe length shortest, the cheapest total of investment cost, and it also is supported by pipe network direct 2 WWTP so main sewer system is not cross the river.Total investment in the planning of'] main sewer 1 system+ IPAL amount Rp .68,375,513,638.00 by diameter range 200 mm - 500 mm, total manhole 51 pieces, and other equipment in form 2 spraying of building. Staging in this alternative is divided into 2 phase, phase I services 24.67% and Phase II services 75.33% by selected alternative cost of Phase I amount Rp. 22,952,339,311.00 and Phase II amount Rp. 45,423,174,327.00 by cost calculation per meter pipe is Rp. 5,182,472.00 I m or amount Rp. 4,558,368.00/house connection.