DETAIL KOLEKSI

Evaluasi sistem penyaliran tambang di PT Bumi Site SDJ PIT North Aje Tanah Bumbu Kalimantan Selatan


Oleh : Clara Suci Ramadhanty

Info Katalog

Nomor Panggil : 759/TT/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Reza Aryanto,S.T.,M.T

Pembimbing 2 : Ir. Taat Tri Purwiyono, M.T

Subyek : Rainfall;Mining engineering

Kata Kunci : rainfall, optimization, pump, open canal, settling pond

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STT_073001500103_Halaman-Judul.pdf 20
2. 2020_TA_STT_073001500103_Pengesahan.pdf 1
3. 2020_TA_STT_073001500103_Bab-1_Pendahuluan.pdf 4
4. 2020_TA_STT_073001500103_Bab-2_Tinjauan-Umum.pdf 26
5. 2020_TA_STT_073001500103_Bab-3_Metedologi-Penelitian.pdf 7
6. 2020_TA_STT_073001500103_Bab-4_Hasil-dan-Pembahasan.pdf 34
7. 2020_TA_STT_073001500103_Bab-5_Kesimpulan-dan-Saran.pdf
8. 2020_TA_STT_073001500103_Daftar-Pustaka.pdf 2
9. 2020_TA_STT_073001500103_Lampiran.pdf

P PT. Bukit Makmur Mandiri Utama (PT BUMA) merupakan perusahaan kontraktor pertambangan batubara terbesar kedua di Indonesia yang beroperasi secara independen. Pada bulan Agustus 2019 akan dilakukan pengeringan pada Sump Pit North AJE yang bertujuan untuk pengambilan batubara pada seam AL yang berada di bawah sump. Maka PT BUMA Site SDJ akan melakukan pengeringan dan mulai di produksi pada bulan September yang di mana volume airsump pada bulan Agustus pada elevasi muka air -17 mdpl dan dasar air -30 mdplyaitu sebesar 331.403,25 m3 dan terdapat air rembesan di sidewall utara pit northAJE yaitu sebesar 0,0007 m3/s atau 1.814,4 m3/s. Rencana pemompaan menggunakan pompa Multiflo 420, dimana dengan RPM 940 dapat menghasilkan debit pompa sebesar 443 m3/jam atau 123 l/s, maka dapat dilakukan optimalisasidengan merelokasi jalur pompa pipa HDPE, penambahan jam kerja pompa, dan menaikkan RPM pompa. Setelah melakukan optimalisasi pompa yaitudilakukannya evaluasi saluran terbuka dan kapasitas KPL dengan menggunakandebit yang dipompakan dan debit limpasan dengan intensitas curah hujan berdasarkan bulan kering dan bulan basah Kepmen 1827/K/30/MEM/2018.

P PT. Bukit Makmur Mandiri Utama (PT BUMA) is the second largest coalmining contracting company in Indonesia that operates independently. PT BUMAis currently producing at PT. Angsana Jaya Energi (AJE) as their client located inAngsana District, Tanah Bumbu Regency, South Kalimantan Province, Indonesia.In August 2019 there will be drying at the North AJE Sump Pit which aims to extractcoal from seam AL is there under the sump. PT BUMA Site SDJ will drain andstart production in September, where the volume of sump water in August at a waterlevel of -17 masl and a bottom of -30 masl is 331,403.25 m3 and there is seepagewater in the north sidewall of the pit. north AJE which is equal to 0.0007 m3 / s or1,814.4 m3 / s. The pumping plan uses the Multiflo 420 pump, where with RPM 940it can produce a pump discharge of 443 m3 / hour or 123 l / s, optimization can bedone by relocating the HDPE pipe pump line, adding pump working hours, andincreasing the RPM of the pump. After optimizing the pump, namely evaluating theopen channel and KPL capacity by using pumped discharge and runoff dischargewith rainfall intensity based on dry and wet months, Kepmen 1827 / K / 30 / MEM/ 2018.

Bagaimana Anda menilai Koleksi ini ?