DETAIL KOLEKSI

Evaluasi hasil squeeze cementing pada sumur M-88 lapangan BAS

5.0


Oleh : Busfi Arusagara

Info Katalog

Nomor Panggil : 839/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Mu'min Priyono Tamsil

Pembimbing 2 : Harin Widiyatni

Subyek : Cement - Productivity;Squeeze cementing planning

Kata Kunci : squeeze cementing, segmented bond tool.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TM_071001300047_-Halaman-Judul.pdf
2. 2018_TA_TM_071001300047_BAB-1.pdf
3. 2018_TA_TM_071001300047_BAB-2.pdf
4. 2018_TA_TM_071001300047_BAB-3.pdf
5. 2018_TA_TM_071001300047_BAB-4.pdf
6. 2018_TA_TM_071001300047_BAB-5.pdf
7. 2018_TA_TM_071001300047_DAFTAR-PUSTAKA.pdf
8. 2018_TA_TM_071001300047_DAFTAR-SIMBOL.pdf
9. 2018_TA_TM_071001300047_LAMPIRAN.pdf

P Pada Tugas Akhir ini di lakukan evaluasi terhadap proses pelaksanaansqueeze cementing untuk menutup lubang perforasi, karena zona tersebut memilikiproduksi air yang tinggi sehingga di butuhkan pemindahan zona produksi.Maksud dan tujuan dari penulisan tugas akhir ini adalah untuk mengevaluasisalah satu fungsi di adakan pelaksanaan squeeze cementing yaitu penutupan zonaperforasi, karena kedalaman zona perforasi yang lama pada sumur E-10 dan E-20akan di tutup sehingga dilakukan pekerjaan squeeze cementing untuk menutup zonaperforasi yang lama agar mendapatkan hasil produksi yang dicapaiProses evaluasi yang di lakukan antara lain: membaca hasil log segmentedbond tool untuk mengetahui integritas ikatan semen pada sumur, perhitungan ulangvolume semen dan aditif, serta biaya dari volume tersebut, perbandingan antarahasil evaluasi yang dilakukan dan hasil aktual beserta perencanaan proses squeezecementing.Berdasarkan proses yang telah di jabarkan di atas hasil yang di dapatkan daritugas akhir ini adalah Volume semen berkurang dari 14,8 bbl atau 70 sak semenmenjadi 13,65 bbl atau 65 sak semen. Berkurangnya volume semen mempengaruhiketinggian semen di dalam casing sehingga tekanan yang di aplikasikan dapat lebihterfokus, Biaya pengerjaan berkurang dari IDR 20.503.000 menjadi IDR19.201.000.

T This final project, evaluation of the process of squeeze cementing is done tocover the perforation hole, because the zone has high water production, so it isneeded to move the production zone.The purpose of this thesis is to evaluate one of the functions held by theimplementation of squeeze cementing which is the closure of the perforation zone,since the depth of the old perforated zone at E-10 and E-20 wells will be closed sothat the squeeze cementing work to cover the perforation zone long to get the resultsachievedThe evaluation process includes: reading the segmented bond tool logs tofind out the integrity of the cement bonds on the well, the recalculation of cementand additive volume, as well as the cost of the volume, the comparison between theresults of the evaluation and the actual results and the planning of the squeezecementing process.Based on the process described above the results obtained from this finalproject is the volume of cement decreased from 14.8 bbl or 70 sacks of cement to13.65 bbl or 65 sacks of cement, Reduced cement volume affect the height ofcement in the casing so that the pressure in apply to be more focused, The cost ofworkmanship is reduced from IDR 20,503,000 to IDR 19,201,000.