DETAIL KOLEKSI

Perhitungan hasil penyemenan sumur eksplorasi WX-1 di lapangan Y


Oleh : M. Jordi Yansya

Info Katalog

Nomor Panggil : 1065/TP/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Lilik Zabidi

Pembimbing 2 : Rizky Akbar

Subyek : Cement;Oil well drilling

Kata Kunci : primary cementing, litecrete, Type G + Silica, CBL.

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2019_TA_TM_071.0014.0092_Halaman-Judul.pdf
2. 2019_TA_TM_071.0014.0092_Bab-1.pdf
3. 2019_TA_TM_071.0014.0092_Bab-2.pdf
4. 2019_TA_TM_071.0014.0092_Bab-3.pdf
5. 2019_TA_TM_071.0014.0092_Bab-4.pdf
6. 2019_TA_TM_071.0014.0092_Bab-5.pdf
7. 2019_TA_TM_071.0014.0092_Daftar-pustaka.pdf
8. 2019_TA_TM_071.0014.0092_Lampiran.pdf

S Sumur WX-1 yang terletak di lapangan Y bertujuan sebagai sumureksplorasi untuk membuktikan cadangan migas. Sumur ini merupakan sumuroffshore vertikal dan dibor sampai kedalaman 10.322 ft. Penyemenan yang akandibahas di tugas akhir ini adalah primary cementing. Pada sumur WX-1, ada duatipe semen yang digunakan yaitu semen Type G + Silica, dan Lightweight Cement(Litecrete).Maksud dari penulis dalam membuat penelitian ini adalah untukmenghitung parameter – parameter yang penting dalam operasi penyemenan,diantaranya adalah mengetahui volume total semen slurry, banyaknya sak semen,volume air, additive, dan volume displacement fluid yang dibutuhkan pada tiaptrayek dan juga mengetahui hasil kualitas penyemenan pada pay zone denganevaluasi CBL.Setelah dihitung, pada Casing 20” diperlukan slurry sebanyak 603 bbl dandisplacement fluid sebanyak 432 bbl. Casing 13-3/8” Membutuhkan lead slurrysebanyak 497 bbl, tail slurry sebanyak 90 bbl dan displacement fluid sebanyak718 bbl. Casing 9-5/8” membutuhkan lead slurry sebanyak 102 bbl, tail slurrysebanyak 146 bbl, dan displacement fluid sebanyak 560 bbl. Liner 7” memerlukanslurry sebanyak 69 bbl dan displacement fluid sebanyak 225 bbl. Hasil CBLcukup baik pada pay zone sehingga tidak diperlukan squeeze cementing.

T The WX-1 well located in the Y field is intended as an exploration well toprove oil and gas reserves. This well is a vertical offshore well and drilled to adepth of 10,322 ft. The cementing that will be discussed in this final project isprimary cementing. In WX-1 well, there are two types of cement used, namelycement Type G + Silica, and Lightweight Cement (Litecrete).The purpose of the author in making this research is to calculate theimportant parameters in cementing operations, including knowing the totalvolume of cement slurry, the amount of cement sacks, volume of water, additives,and volume displacement fluid needed on each trajectory and also knowing thequality of cementing on pay zone with CBL evaluation.Once calculated, in the 20" casing 603 bbl of slurry and 432 bbl ofdisplacement fluid is required. 13-3/8 " casing Requires 497 bbl lead slurry, 90bbl tail slurry and 718 bbl displacement fluid. 9-5/8 " casing requires 102 bbllead slurry, 146 bbl tail slurry, and 560bbl displacement fluid. Liner 7 "requires69 bbl slurry and 225 bbl displacement fluid. The CBL results are quite good atthe pay zone so there is no need for squeeze cementing.

Bagaimana Anda menilai Koleksi ini ?