DETAIL KOLEKSI

Analisis uji pressure build up dan flow after flow pada sumur CLK-19 lapangan C

0.0


Oleh : Ayuk Nur'aini

Info Katalog

Nomor Panggil : 1344/TP/2021

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2021

Pembimbing 1 : M.Taufiq Fathaddin

Pembimbing 2 : R.Hari Karyadi Oetomo

Subyek : Oil wells - Testing

Kata Kunci : pressure build up test, flow after flow, permeability, skin factor, AOFP

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2021_TA_STP_071001600019_Halaman-Judul.pdf
2. 2021_TA_STP_071001600019_Pengesahan.pdf
3. 2021_TA_STP_071001600019_Bab-1_Pendahuluan.pdf
4. 2021_TA_STP_071001600019_Bab-2_Tinjauan-Umum.pdf
5. 2021_TA_STP_071001600019_Bab-3_Metodologi-Penelitian.pdf
6. 2021_TA_STP_071001600019_Bab-4_Hasil-dan-Pembahasan.pdf
7. 2021_TA_STP_071001600019_Bab-5_Kesimpulan.pdf
8. 2021_TA_STP_071001600019_Daftar-Pustaka.pdf
9. 2021_TA_STP_071001600019_Lampiran.pdf

U Uji pressure build up adalah salah satu teknik dalam pengujian tekanan transien yang dilalukan dengan dua tahap yaitu memproduksikan sumur dengan laju tetap, dan penutupan sumur selama waktu tertentu. Analisis pressure build up test dilakukan dengan mengamati perubahan tekanan selama tahap penutupan sumur.Tahapan penutupan sumur dilakukan hingga mencapai kondisi stabil dimanatekanan dasar sumur mendekati keadaan awal. Uji pressure build up pada sumurCLK-19 dilakukan untuk menentukan karakteristik reservoir di Lapangan C sepertipermeabilitas, faktor skin, dan jarak sumur ke patahan. Dari uji pressure build updi peroleh parameter tekanan reservoir, permeabilitas, faktor skin, dan jarakkepatahan berturut-turut sebesar 2537,87 psia, 5,11 md, -4,53, 475 ft. Di sampingitu, juga dilakukan uji deliverabitas yaitu flow after flow. Uji flow after flowdilakukan dengan cara memproduksikan dengan tiga laju alir. Untuk setiap laju alirdi pertahahankan hingga mencapai kondisi stabil. Dari uji ini diperoleh parameterindeks produktivitas (C), turbulensi (n), dan laju alir maksimum (AOFP) secaraberturut-turut adalah sebesar 0.0405757 Mscfd/psia, 0,789, 9259,9 Mscf/d.

P Pressure build up test is one of the techniques in transient pressure testingthat is done with two stages, namely producing wells at a fixed rate, and closingwells for a certain time. Pressure build up test analysis is done by observingpressure changes during the closing stage of the well. The closing stage of the wellis carried out until it reaches a stable condition where the base pressure of the wellis close to the initial state. Pressure build up test on CLK-19 well is conducted todetermine reservoir characteristics in Field C such as permeability, skin factor,and distance from the well. From the pressure build up test obtained reservoirpressure parameters, permeability, skin factor, anddistance of resistancerespectively of 2537.87 psia, 5,11md, -4.53, 1,475 ft. In addition, deliverabitas testis also carried out, namely flow after flow. Flow after flow test is done by producingwith three flow rates. For each flow rate in the retained until it reaches a stablecondition. From this test obtained productivity index parameters (C), turbulence(n), and maximum flow rate (AOFP) respectively is 0.0405757 Mscfd/psia, 0.789,9259.9 Mscf/d.

Bagaimana Anda menilai Koleksi ini ?