DETAIL KOLEKSI

Analisis pengaruh pemeringkatan massa batuan terhadap geometri peledakan dan jumlah bahan peledak pada PT. Indocement Tunggal Prakarsa, Jawa Barat.


Oleh : Dimas Aditya Nugraha

Info Katalog

Nomor Panggil : 1192/TG/2020

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2020

Pembimbing 1 : Dr. Ir. Hidartan, M.S.

Subyek : Blasting

Kata Kunci : rock mass, blasting geometry, powder factor

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2020_TA_STG_072001500026_Halaman-Judul.pdf
2. 2020_TA_STG_072001500026_Pengesahan.pdf
3. 2020_TA_STG_072001500026_Bab-1_Pendahuluan.pdf
4. 2020_TA_STG_072001500026_Bab-2_Tinjauan-Umum.pdf
5. 2020_TA_STG_072001500026_Bab-3_Metodelogi-Penelitian.pdf
6. 2020_TA_STG_072001500026_Bab-4_Hasil-dan-Pembahasan.pdf
7. 2020_TA_STG_072001500026_Bab-5_Kesimpulan.pdf
8. 2020_TA_STG_072001500026_Daftar-Pustaka.pdf
9. 2020_TA_STG_072001500026_Lampiran.pdf

D Dalam penambangan batugamping PT. Indocement Tunggal Prakarsa Tbk.menggunakan metode kuari berjenjang dan peledakan. Analis massa batuan sertakarakteristik harus diperhatikan untuk menentukan geometri peledakan, berat totalbahan peledak, dan nilai powder faktor yang bertujuan untuk mengoptimalkannilai ekonomis dalam kegiatan penambangan. Penentuan geometri peledakandilakukan dengan melakukan analisis RMR yang kemudian dikonversikanmenjadi parameter blastability index menurut Lilly, 1986. Bedasarkan hasilpembobotan RMR kelas batuan yaitu kelas I yang berati sangat baik, kemudiannilai Blastability index yaitu 47,75. Penentuan geometri peledakan menurut R.L.Ash mempunyai nilai Burden 2,79, spasi 5,59, kedamalan lubang 11,1 subdrill0,82, stemming 1,95, charge 9,14 tinggi jenjang 18,4 dan Power Factor 0,44.Kemudian setelah dikorelasi antara nilai Blastability index dengan diameterlubang ledak didapati nilai burden 6 dan spasi 6, kedamalan lubang 11,1 subdrill0,82, stemming 1,95, charge 9,14 tinggi jenjang 18,4 dan Power Factor 0,18 yangberate mencapai standar yang ditentukan oleh PT. Indocement Tunggal Prakrasa

I In limestone mining, PT. Indocement Tunggal Prakarsa Tbk. using the tiered andblasting quarry method. Analysis of rock mass and characteristics must beconsidered to determine the geometry of blasting, the total weight of explosives,and the value of powder factors that aim to optimize the economic value in miningactivities. Determination of the blasting geometry is done by analyzing the RMRwhich is then converted into a blastability index parameter according to Lilly,1986. Based on the weighting results of the rock class RMR namely class I whichhas a very good rating, then the Blastability index value is 48.25. Determinationof blasting geometry according to R.L. Ash has a Burden value is 2.79, a space is5.59, a hole thickness is 11.1 subdrill is 0.82, stemming is 1.95, a high 18,4charge is 9,14 and a Power Factor is 0.44. Then after correlating between theBlastability index value and the diameter of the explosive hole, it was found thatthe burden value is 6 and the space is 6, the hole thickness is 11.1 subdrill is 0.82,stemming is 1.95, the charge is 9.14, the height is 18.4 and the Power Factor is0.18. means achieving the standards set by PT. Indocement Tunggal Prakrasa.

Bagaimana Anda menilai Koleksi ini ?