DETAIL KOLEKSI

Kajian teknis produktivitas jumbodrill pada penambangan emas PT. Cibaliung Sumberdaya , Desa Mangkualam, Kec. Cimanggu, Kab . Pandeglang ,Banten

1.6


Oleh : Aditya Ryan Satriolla

Info Katalog

Nomor Panggil : 614/TT/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Hermanto Saliman

Pembimbing 2 : Irfan Marwanza

Subyek : Mining - Gold;Mining business - Productivity

Kata Kunci : Jumbodrill, productivity, underground, gold, minerals

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TB_07312007_Halaman-judul.pdf
2. 2018_TA_TB_07312007_Bab-1.pdf 3
3. 2018_TA_TB_07312007_Bab-2.pdf
4. 2018_TA_TB_07312007_Bab-3.pdf
5. 2018_TA_TB_07312007_Bab-4.pdf
6. 2018_TA_TB_07312007_Bab-5.pdf
7. 2018_TA_TB_07312007_Daftar-Pustaka-+-Lampiran.pdf

P PT Cibaliung Sumberdaya mempunyai target produksi sebesar 16.000 wmt/bulan.Sedangkan produksi alat bor aktual yang di dapat pada pengamatan yaitu 8.001,33wmt/bulan, artinya belum memenuhi target produksi yang di tetapkan. Oleh karnaitu perlu dilakukan evaluasi terhadap produktivitas dari alat bor yang digunakan.Salah satu faktor tidak tercapainya target produksi yaitu kurangnya komunikasiantara operator Jumbo drill dengan bagian mekanik disebabkan oleh keterbatasanalat komunikasi. Hal ini mempengaruhi presentase efisiensi kerja Jumbodrill.Setelah dilakukan perhitungan maka didapatkan waktu Mechanical Availability(MA) Jumbodrill sebesar 49%. Waktu Physical Availability (PA) sebesar 64%.Waktu Use of Availability (UA) sebesar 53%, dan efisiensi kerja atau EffectiveUtilization (EU) sebesar 34%. Efisiensi kerja aktual alat bor pada kegiatanpenambangan dikategorikan jelek karena nilai efisiensi kerja kurang dari 67%.Setelah melakukan evaluasi maka upaya yang dilakukan untuk menaikanproduktivitas salah satunya melakukan maintenance alat pada setiap shift danmenambahkan alat komunikasi untuk operator Jumbo drill.

P PT Cibaliung Sumberdaya is one of the mineral mining businesses owned byIndonesian BUMN. The mining activity of PT Cibaliung Sumberdaya uses anunderground mining system with a cut and fill mining method with a productiontarget of 16,000 wmt / month. The actual drill production equipment that wasobtained in the observation was 10869.32 wmt / month which did not meet theproduction target set. Therefore, it is necessary to evaluate the productivity of thedrill tools used. Not achieving production targets is caused by obstacles, bothavoidable obstacles and obstacles that cannot be avoided. These constraints causelow efficiency of drill tools. The actual work efficiency of drill tools in miningactivities is categorized as poor because the value of work efficiency is less than67%. Efforts made to improve the productivity of mechanical equipment areimprovements in work efficiency by eliminating work barriers that can be avoided.After making improvements from the working time, the working time is obtainedafter 228.73 minutes / shift. Availability of equipment after repair: MechanicalAvailability (MA) or mechanical availability, namely 76.25%, Physical Availability(PA) or 85.22% physical availability, Use of Availability (UA) or 56.30% usageavailability, and Effective Utilization (EU) or effective use of 48.36%. After makingrepairs, the drill tool production increased from 10869.32 wmt / month to 15879.60wmt / month.

Bagaimana Anda menilai Koleksi ini ?