DETAIL KOLEKSI

Efektifitas Prefabricated Vertical Drain (pvd) dengan perbandingan rasio koefisien Horizontal Konsolidasi (Ch) di Pantai Indah Kapuk 2


Oleh : Nanda Wahyu Wicaksana

Info Katalog

Penerbit : FTSP - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2022

Pembimbing 1 : Tech Muhammad Zaki

Subyek : Soil consolidation test

Kata Kunci : Prefabricated Vertical Drain (PVD), horizontal consolidation coefficient (Ch), preloading

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2022_TA_STS_051001600063_Halaman-Judul.pdf
2. 2022_TA_STS_051001600063_Lembar-Pengesahan.pdf
3. 2022_TA_STS_051001600063_Bab-1_Pendahuluan.pdf
4. 2022_TA_STS_051001600063_Bab-2_Tinjauan-Pustaka.pdf
5. 2022_TA_STS_051001600063_Bab-3_Metodologi-Penelitian.pdf
6. 2022_TA_STS_051001600063_Bab-4_Analisis-dan-Pembahasan.pdf
7. 2022_TA_STS_051001600063_Bab-5_Kesimpulan.pdf
8. 2022_TA_STS_051001600063_Daftar-Pustaka.pdf
9. 2022_TA_STS_051001600063_Lampiran.pdf

T Tanah lempung merupakan tanah yang memiliki partikel tertentu didalamnya, volume poriyang besar mengakibatkan tanah mempunyai berat isi, sudut geser yang kecil serta dayadukung yang rendah sehingga ketika tanah lempung menerima beban diatasnya tanahtersebut mengalami penurunan akibat terdisipasinya air pori tanah. Penurunan terjadi dalamwaktu yang lama, sehingga dilakukan perbaikan tanah dengan menggunakan PrefabricatedVertical Drain (PVD) yang dikombinasikan dengan preloading agar mempercepat waktukonsolidasi. Analisis penurunan tanah dihitung menggunakan data korelasi menggunakandata NSPT dan selanjutnya dilakukan analisis perbaikan tanah dengan menggunakan TeoriHansbo dengan membandingan rasio koefisien horizontal konsolidasi (Ch) danmembandingkan tanpa dan dengan beban beban traffic. Hasilnya menunjukan tanpa bebantraffic sebesar 0,926 meter, dengan beban traffic sebesar 1,128 meter. Dan hasilperhitungan menggunakan Prefabricated Vertical Drain (PVD) didapatkan yang palingefesien dengan koefisien harizontal konsolidasi (Ch) Ch=4Cv dengan memiliki waktupenurunan dari berbagai spasi yaitu, S100cm = 2 bulan, S150cm = 4 bulan. S200cm = 8bulan, S250cm = 13 bulan, S300cm = 19 bulan, S350cm = 27 bulan, S400cm = 36 bulan,S450cm = 46 bulan, dan S500cm = 58 bulan. Dengan mengalami penurunan tanpa bebantraffic yang konstan di kedalaman 0,926 meter dan dengan menggunakan beban trafficnilai penurunan dengan masing – masing spasi yaitu, S100cm = 2 bulan, S150cm = 5 bulan.S200cm = 10 bulan, S250cm = 15 bulan, S300cm = 23 bulan, S350cm = 32 bulan, S400cm= 43 bulan, S450cm = 55 bulan, dan S500cm = 70 bulan. Dengan mengalami penurunanyang konstan sebesar 1,128 meter.

C Clay soil has particular particles in it, a large pore volume leads the soil to have a bulk density, small shear angle, and low bearing capacity, and when clay is loaded, the soil lowers owing to pore water dissipation. Because the settlement had been going on for a long time, soil improvement was done with Prefabricated Vertical Drain (PVD) and preloading to speed up the consolidation process. Land subsidence was computed using NSPT data for correlation, and soil improvement was determined using Hansbo Theory by comparing the horizontal consolidation coefficient ratio (Ch) and comparing without and with traffic loads. There is no traffic load of 0.926 meters, there is a traffic load of 1.128 meters, according to the data. The results of calculations utilizing Prefabricated Vertical Drain (PVD) revealed that it is the most economical with a horizontal consolidation coefficient (Ch) Ch=4Cv and reduction in time from various spaces, namely S100cm = 2 months, S150cm = 4 months. S200cm = 8 months, S250cm = 13 months, S300cm = 19 months, S350cm = 27 months, S400cm = 36 months, S450cm = 46 months, and S500cm = 58 months. There is a steady no-load decline in throughput at a depth of 0.926 meters and the decreasing value with each space utilizing the traffic load is S100cm = 2 months, S150cm = 5 months. S200cm = 10 months, S250cm = 15 months, S300cm =23 months, S350cm = 32 months, S400cm = 43 months, S450cm = 55 months, and S500cm = 70 months.

Bagaimana Anda menilai Koleksi ini ?