DETAIL KOLEKSI

Penentuan titik infill untuk pengembangan Lapangan GEE menggunakan software Geologi Modelling


Oleh : Arbima Busro

Info Katalog

Nomor Panggil : 2233/TP/2014

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2014

Pembimbing 1 : Lestari Said

Pembimbing 2 : Sri Fenny

Subyek : Petroleum Engineering

Kata Kunci : infill point, onshore field development, software Geological Modeling

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2014_TA_TM_07108020_1.pdf
2. 2014_TA_TM_07108020_2.pdf
3. 2014_TA_TM_07108020_3.pdf
4. 2014_TA_TM_07108020_4.pdf
5. 2014_TA_TM_07108020_5.pdf
6. 2014_TA_TM_07108020_6.pdf
7. 2014_TA_TM_07108020_7.pdf
8. 2014_TA_TM_07108020_8.pdf

L Lapangan Gee merupakan lapangan onshore penghasil minyak yang terletak di propinsi Jambi, sekitar 50 kilometer sebelah BaratDaya kota Jambi. Lapangan ini memiliki kedalaman yang dangkal yaitu hanya 400m saja dengan formasi Air Benakat dan memiliki sisa cadangan untuk di produksi sebesar 1.168 MSTB. Sekarang ini Lapangan Gee sudah dalam tahap produksi. Geologi modelling lapangan ini dilakukan dengan menggunakan software petrel 2009. Penentuan titik infill merupakan usaha percepatan untuk meningkatkan produksi dan meningkatkan efisiensi waktu. Untuk melakukan titik infill perlu dilakukan beberapa langkah Pertama, Pemodelan didasarkan pada peta geologi, seismik, dan data sumur yang dalam pengolahannya menghasilkan pemodelan struktur, fasies, dan persebaran model properti dari porositas, saturasi air, dan juga net to gross Model geologi Lapangan gee yang telah di buat perlu dilakukan realisasi untuk properti Saturasi air, Net To Gross, dan porositas. Tujuannya adalah agar menyerupai keadaan geologi sesuai realita di lapangan. Setelah reservoir termodelkan, proses perhitungan dapat dilakukan persamaan perhitungan cadangan. Lalu setelah itu penentuan titik infill dapat dilakukan

G Gee field is located is onshore field whom produce oil located in jambi province. Is about 50 kilometres in SouthWest of jambi city. The field only has a depth of 400 m with Air Benakat formation and have remaining reserves to be developed is 1.168 MSTB. Recently Gee field in on production. Geology modelling of this field was performed using software petrel 2009. Determination of point infill are an accelaration effort to enhances production and increase time efficiency. There’s some step how to do it Firstly, the modelling is base on geology map, seismic, and well data in processing result structure modelling, Facies, and dispersion of property modelling from, porosity, saturation water, and also net to gross Geologgy model of gee field that been made neet to be realisation for property saturation water, Net to Gross, and porosity. The purpose is that resembling geological condition just like reality in the field. After reservoir modelled, calculation process can be conducted similarities reserve calculation. Then determination of point infill can be done

Bagaimana Anda menilai Koleksi ini ?